4
5
s p m i n s t r u m e n t . c o m | i n f o @ s p m i n s t r u m e n t . s e
Setting up Airius
Airius II LTE-M is configured and linked to the subscription and Condmaster
license when shipped from SPM Instrument, which means no setup other than
the following is required to get started with Airius II LTE-M sensors:
1. Perform the mechanical installation, see
Mechanical installation, Airius
vibration sensors
.
2. Press the button on the sensor to perform a function and connection test.
Immediate green flashing means that the sensor is working. When the
connection to Condmaster Entity Server (CES) is successful, the sensor
flashes green. The number of green flashes corresponds to the LTE-M
signal strength (1 flash = poor; 2 flashes = average; 3 flashes = good). If
the connection is unsuccessful, the sensor flashes red (1 flash = could not
connect to the server; 2 flashes = invalid subscription, contact your sales
representative; 3 flashes = CES is offline; 4-5 flashes = CES did not respond).
3. Set up vibration measurements. Follow the steps in
Setting up vibration
measurements in Condmaster Ruby
or
Setting up vibration measurements
in Condmaster.NET
, depending on the software used.