Splitty – User Manual
Splitty.nl
7) Installation and operation.
After you have installed all the devices having followed the outlines previously
mentioned, it is sufficient to insert the original Smartcard in the appropriate slot with the
gold contacts turned towards the bottom. The Led on top of the central unit will flash
three times to indicate that the inner test has occurred. In case this did not happen
make sure that you have inserted the card correctly and that local power source is
connected correctly. Subsequently the Led will begin to flash at regular intervals. Once
the dummy smartcard is inserted the same led flashing will become less frequent. When
the Dummy card will ask for the information from the original smartcard, for information
of some data, the led will flash faster and irregular, to indicate the transfer of the useful
information.
In case the visualization of the channels did not happen, extract the dummy smartcard
and reinsert it. If also this operation showed no effect, retry the entire procedure from
the beginning. If this did not solve the problem, please refer to chapter 8 of this manual.