P a g e
|
4
www.SPLASHwash.com
Questions?
(888) 784-0802
Step 3:
Plumbing the water line
Thread the bung tube into the 55 gal methanol drum.
Secure the quick connect to the bung in the drum. Make sure the quick connect is snug.
Attach the methanol hose from the quick connect to the manifold located in the proportioner.
Make sure the 55 gal drum of methanol is grounded! (Wire and alligator clip is recommended)
Drill a 7/16” hole in the center of the concentrate spout cap.
Locate the concentrate hose inside the proportioner and through the top of the 7/16” hole.
Insert the concentrate screen into the end of the concentrate tube, then screw onto the 5 gal
pail of concentrate.
NOTICE: THE METHANOL BARREL MUST BE GROUNDED
NOTICE: A back-flow preventer in compliance with local
and/or state requirements must be installed on the water
line to bring the unit to safety standards.