Spirax Sarco Steam Jet Thermocompressor Installation And Maintenance Instructions Manual Download Page 5

IM-P493-01

 EMM Issue 2

5

2. General product information

2.1 General description

The SJT Steam Jet Thermocompressor is designed having a fabricated metallic construction.

The Thermocompressor may (or may not) incorporate an 'Actuator assembly', a 'Positioner' 

and an 'Air regulating set'. If the Thermocompressor is supplied complete with these 

accessories, the reader will find the Instruction Manuals for these items to the rear of this 

document.

An SJT Steam Jet Thermocompressor can be described as a particular type of Ejector. An 

Ejector is a device in which steam under pressure is used to entrain a gas or vapour that is 

at a lower pressure. Within the Body of the Ejector, the two gases become intimately mixed 

and are subsequently discharged at a pressure that lies somewhere between the original 

steam pressure and the pressure of the entrained gas or vapour.

When the gas being entrained is purely water vapour, the Ejector is referred to as a Steam 

Jet Thermocompressor.

Standards

These products fully comply with the requirements of the European Pressure Equipment 

Directive 97 / 23 / EC. The product is manufactured to ASME B31.3 mechanical design code.

Certification

This product is available with certification to EN 10204 3.1. 

Note: 

All certification / inspection 

requirements must be stated at the time of order placement.

2.2 Materials

The materials of construction for an SJT depend upon the following: 

a)

The size of the SJT (reflects how the SJT is designed and made).

b)

The Mechanical Design Temperature (MDT). 

c)

The Minimum Metal Design Temperature (MDMT, not often specified). 

The most common material of construction for Spirax-Sarco Limited's SJT is carbon steel. 

Chrome Molybdenum materials are used for high temperature applications and occasionally 

stainless steel grade 316L is employed. A carbon steel SJT tends to employ stainless steel 

316L motive steam nozzles.

Component

Carbon steel

Stainless steel Gr. 316L Chrome Molybdenum

MDT

 

Mechanical 

Design Temperature

up to and including 

425

 

°C (797 °F) 

up to and including 

500

 

°C (932F)

above 425

 

°C (797 °F) up to 

and including 570

 

°C (1058 °F)

Pipe

ASTM A106 Gr. B

ASTM A312 TP 316L

ASTM A335 P11

Fittings

ASTM A234 WPB

ASTM A403 WP 316L

ASTM A234 WP11

Forgings

ASTM A105N or 

ASTM A350 LF2N

ASTM A182 F316L

ASTM A182 F11

Bar

ASTM A350 LF2N

ASTM A479 316L

ASTM A739 B11

Plate

ASTM A516 Gr. 70

ASTM A240 316L

ASTM A387 Gr. 11

Flanges

ASTM A105N

ASTM A182 F316L

ASTM A182 F11

Bolts 

ASTM A193 Gr. 7

ASTM A193 Gr. B8

ASTM A193 Gr. B16

Nuts 

ASTM A194 Gr. 2H

ASTM A194 Gr. 8

ASTM A194 Gr. 4

Washers 

ASTM F436 Gr. 8 or

BS 4320 Gr. 8 or

BS 3410 Gr. 8

ASTM F436 Gr. A2 or

ASTM F436 Gr. A4 or

BS 4320 Gr. A4 or

BS 3410 Gr. A2 or

BS 3410 Gr. A4

ASTM F436 Gr. A2 or

ASTM F436 Gr. A4 or

BS 4320 Gr. A4 or

BS 3410 Gr. A2 or

BS 3410 Gr. A4

Summary of Contents for Steam Jet Thermocompressor

Page 1: ...horizontal plane 1 Safety information 2 General product information 3 Installation 4 Operation 5 Maintenance 6 Commissioning 7 Spare parts 8 Troubleshooting IM P493 01 EMM Issue 2 4930000 1 SJT Steam...

Page 2: ...and temperature and their maximum and minimum values If the maximum operating limits of the product are lower than those of the system in which it is being fitted or if malfunction of the product cou...

Page 3: ...have suitable tools and or consumables available Use only genuine Spirax Sarco replacement parts 1 10 Protective clothing Consider whether you and or others in the vicinity require any protective clo...

Page 4: ...d to temperatures below freezing point 1 15 Disposal Unless otherwise stated in the Installation and Maintenance Instructions this product is recyclable and no ecological hazard is anticipated with it...

Page 5: ...ts must be stated at the time of order placement 2 2 Materials The materials of construction for an SJT depend upon the following a The size of the SJT reflects how the SJT is designed and made b The...

Page 6: ...it is suitable for the intended service Details of the mechanical rating can be found on the name plate and associated documentation Fig 1 SJT Steam Jet Thermocompressor illustrating the preferred ins...

Page 7: ...ly 6 to 10 pipe diameters away from the unit We strongly recommend that the Installation Engineer performs velocity calculations to size the suction pipework and does not simply make the piping the sa...

Page 8: ...proposed installation is to have the thermocompressor discharging directly to the atmosphere we recommend that a silencer is fitted to bring the noise down to an acceptable level 3 3 5 The discharge p...

Page 9: ...work is easy All connections are flanged and only 3 connections are necessary The Motive Connection is to be connected to the Motive Steam Line The Suction Connection is to be connected to the Suction...

Page 10: ...steam requirement As a consequence of this when the Thermocompressor is only required to perform low duty and therefore only requiring a low amount of motive steam if some form of steam flow regulati...

Page 11: ...ted on the Pressure Gauges positioned immediately before and after the unit if fitted 4 3 3 If fitted open the Isolating Valve in the suction line 4 3 4 The Thermocompressor should now be fully operat...

Page 12: ...tings for corrosion debris build up and blockages 4 Strainers for debris build up 5 Leakage on any piping and related process equipment 6 SatisfactoryoperationofassociatedSteamTrapsforensuringthatcond...

Page 13: ...contract reference Your item number if applicable 3 Whilst the Nozzle is removed from the unit it is possible to inspect the Diffuser The bore should be parallel and should not appear warped 4 Re asse...

Page 14: ...ign Specification or the design of the unit must be modified The use of pressure above the design value usually improves performance slightly up to a point beyond which no improvement is noted A varyi...

Page 15: ...k for and remove any restrictions or blockages check the line sizing of the suction pipework and increase it if necessary check for satisfactory operation of Non return Valves and finally in the case...

Page 16: ...IM P493 01 EMM Issue 2 16...

Page 17: ...IM P493 01 EMM Issue 2 17...

Reviews: