Spirax Sarco Steam Jet Thermocompressor Installation And Maintenance Instructions Manual Download Page 2

IM-P493-01

 EMM Issue 2

2

1. Safety information

Safe operation of these products can only be guaranteed if they are properly 

installed, commissioned, used and maintained by qualified personnel 

(see Section 1.11) in compliance with the operating instructions. General 

installation and safety instructions for pipeline and plant construction, as well 

as the proper use of tools and safety equipment must also be complied with.

1.1 Intended use

Referring to the Installation and Maintenance Instructions, name-plate and Technical 

Information Sheet, check that the product is suitable for the intended use / application. 

The product complies with the requirements of the European Pressure Equipment 
Directive  97 / 23 / EC  and  carries  the 

 mark when so required. The product falls 

within the Pressure Equipment directive categories as shown below:

Application Group 1

Gases

Group 2

Gases

Group 1 

Liquids

Group 2

Liquids

Steam

Will not exceed Cat. 3

Water

Will not exceed Cat. 2

i)

This product has been specifically designed for use on steam which is in Group 

2 of the above mentioned Pressure Equipment Directive.

ii) Check material suitability, pressure and temperature and their maximum and 

minimum values. If the maximum operating limits of the product are lower than 

those of the system in which it is being fitted, or if malfunction of the product 

could result in a dangerous overpressure or overtemperature occurrence, ensure 

a safety device is included in the system to prevent such over-limit situations.

iii) Determine the correct installation situation and direction of fluid flow.

iv) Spirax Sarco products are not intended to withstand external stresses that 

may be induced by any system to which they are fitted. It is the responsibility 

of the installer to consider these stresses and take adequate precautions to 

minimise them.

v) Remove protective covers from all connections and protective film from all 

name-plates, where appropriate, before installation on steam and water lines.

1.2 Access

Ensure safe access and if necessary a safe working platform (suitably guarded) 

before attempting to work on the product. Arrange suitable lifting gear if required.

1.3 Lighting

Ensure adequate lighting, particularly where detailed or intricate work is required.

1.4 Hazardous liquids or gases in the pipeline

Consider what is in the pipeline or what may have been in the pipeline at some 

previous time. Consider: flammable materials, substances hazardous to health, 

extremes of temperature.

Summary of Contents for Steam Jet Thermocompressor

Page 1: ...horizontal plane 1 Safety information 2 General product information 3 Installation 4 Operation 5 Maintenance 6 Commissioning 7 Spare parts 8 Troubleshooting IM P493 01 EMM Issue 2 4930000 1 SJT Steam...

Page 2: ...and temperature and their maximum and minimum values If the maximum operating limits of the product are lower than those of the system in which it is being fitted or if malfunction of the product cou...

Page 3: ...have suitable tools and or consumables available Use only genuine Spirax Sarco replacement parts 1 10 Protective clothing Consider whether you and or others in the vicinity require any protective clo...

Page 4: ...d to temperatures below freezing point 1 15 Disposal Unless otherwise stated in the Installation and Maintenance Instructions this product is recyclable and no ecological hazard is anticipated with it...

Page 5: ...ts must be stated at the time of order placement 2 2 Materials The materials of construction for an SJT depend upon the following a The size of the SJT reflects how the SJT is designed and made b The...

Page 6: ...it is suitable for the intended service Details of the mechanical rating can be found on the name plate and associated documentation Fig 1 SJT Steam Jet Thermocompressor illustrating the preferred ins...

Page 7: ...ly 6 to 10 pipe diameters away from the unit We strongly recommend that the Installation Engineer performs velocity calculations to size the suction pipework and does not simply make the piping the sa...

Page 8: ...proposed installation is to have the thermocompressor discharging directly to the atmosphere we recommend that a silencer is fitted to bring the noise down to an acceptable level 3 3 5 The discharge p...

Page 9: ...work is easy All connections are flanged and only 3 connections are necessary The Motive Connection is to be connected to the Motive Steam Line The Suction Connection is to be connected to the Suction...

Page 10: ...steam requirement As a consequence of this when the Thermocompressor is only required to perform low duty and therefore only requiring a low amount of motive steam if some form of steam flow regulati...

Page 11: ...ted on the Pressure Gauges positioned immediately before and after the unit if fitted 4 3 3 If fitted open the Isolating Valve in the suction line 4 3 4 The Thermocompressor should now be fully operat...

Page 12: ...tings for corrosion debris build up and blockages 4 Strainers for debris build up 5 Leakage on any piping and related process equipment 6 SatisfactoryoperationofassociatedSteamTrapsforensuringthatcond...

Page 13: ...contract reference Your item number if applicable 3 Whilst the Nozzle is removed from the unit it is possible to inspect the Diffuser The bore should be parallel and should not appear warped 4 Re asse...

Page 14: ...ign Specification or the design of the unit must be modified The use of pressure above the design value usually improves performance slightly up to a point beyond which no improvement is noted A varyi...

Page 15: ...k for and remove any restrictions or blockages check the line sizing of the suction pipework and increase it if necessary check for satisfactory operation of Non return Valves and finally in the case...

Page 16: ...IM P493 01 EMM Issue 2 16...

Page 17: ...IM P493 01 EMM Issue 2 17...

Reviews: