122PB UNEVEN PRO BARS ll
Assembly Instructions
Page 3 of 11
1.1. Uneven Pro Bar Set-Up
1. Layout and mark the floor referring to the measurements in your tie-down system instructions.
This will determine the position of the anchor holes and uneven bar assembly. Mark the base
position and the location of the mount pin holes (See diagram on next page).
After laying out all holes, check all measurements before drilling
.
2. Drill and install floor anchors into concrete by following the
manufacturer’s instructions or Spieth
America tie-down systems instructions.
Note that it is
IMPORTANT
that the floor anchors be properly set since they will need to
withstand large amounts of tension from the cables. Always double check anchors after
initial installations to ensure that they are not pulling out.
3. Drill and install the mount pins as shown below.
a. Lay base tube on its side and check hole location before drilling.
b. Drill (4)
1/2” diameter x 1-1/4” deep holes in concrete for mount pins.
c. Insert supplied mount pins in drilled holes.
The mount pins must be installed properly in uneven bar base tubes and floor before
using the apparatus.