SPI Supplies
18
SPI-DRY Critical Point Dryer
5
Installation
SPI Supplies carefully packs all
instruments so that they will reach their destination in perfect
working order. Do NOT discard any packing materials until the unit has been inspected for any
transit damage and the instrument has been used to the customers satisfaction.
If any damage is found, notify the carrier and SPI Supplies (or local agent) immediately. If it is
necessary to return the shipment, use the packaging as supplied and follow the instructions in this
manual for return of goods paragraph 3.1.
5.1
Unpacking Checklist
The
Equipment package will normally be despatched from the factory in one box. Inside the box
the following will be found, refer and check each item off against the supplied packing list.
13200JE-AB Unit, comprised of pressure vessel, pressure gauge, temperature gauge,
three control valves, base/safety valve assembly
High pressure transfer hose
Tubing for water connections
Liquid transfer boat with basket assembly
Tool kit (window retaining ring spanner & tommy-bar for specimen door removal/sealing)
Spare parts kit
Operating Manual
5.1.1
Site Selection
The critical point dryer should be positioned in the laboratory convenient for:
(a)
Hot and cold water supply
(b)
Good ventilation
(c)
Space for carbon dioxide siphon cylinder