23
The charging station switches off the charging point in case of the following ambient conditions:
Overload
Temperature too high
Temperature too low
Humidity too high
Sabotage attempts (BCS Smart only)
Control elements and connections
Pos . no . .
Description
1
Housing cover with special head screws (tool enclosed)
2
230 V with child lock (one on each side)
3
System connector, e.g. Bosch or Shimano, depending on the equipment
4
BCS Smart only:
supply line for LAN connection
5
Supply line for rechargeable battery-specific system connector
6
Supply line for rechargeable battery-specific system connector
7
Mains connection
8
System connector, e.g. Bosch or Shimano, depending on the equipment
9
LED status display
10
External fixing brackets
Under the housing cover, there are LEDs that display the status of the respective charging point.
LED
Status
Off
Charging point off
Green
Charging point ready or charging process finished
Green/flashing
Charging process running
Red
Fault at charging point
1
2
2
4
5
6
7
8
3
9
10
Figure 1:
Overall view
Summary of Contents for BCS Pure
Page 7: ...7 Abb 3 Abstände Wandmontage in mm Montagemaße in mm 1400 min 700 min 700 min ...
Page 38: ...38 ...
Page 39: ...39 ...