Guide for HD5 Assembly
OPSMN011 Rev 3
Dated: 29.06.2022
27
Step 16:
Zip-tie the Ethernet, router power, camera usb, and mobile extension cables. Plug the ethernet into
the router and the O-droid board then plug the blue usb cable into the o-droid board.
Step 17:
Attach the load cable to the solar charge controller as shown below.