Worksurface-to-top of Equipment Rack:
1. Set the worksurface onto the equipment rack and any adjacent
assembled wall filler panels (if applicable).
Figure 7B
.
2. Align the worksurface and equipment rack mounting holes.
3. Attach worksurface with (4) 1/4-20 x 15mm JC bolts.
1. Attach each worksurface bracket to the equipment rack with (1)
1/4-20 x 50mm JC bolt and (1) 1/4-20 serrated flanged locknut
(attached from inside eq rack).
(The slotted side of the bracket will
attach to the worksurface.) Do not tighten completely.
Figure 7C
.
2.
Set the worksurface onto the assembled wall filler panel(s) and
worksurface brackets and align the mounting holes.
3. Attach worksurface with 1/4-20 x 15mm JC bolts.
4. Align the tops of the worksurfaces and tighten all screws securely.
Cord Clips
1. Apply cord clips to underside of worksurface where needed
to route and secure cords.
Figure 8
.
(Clips only included with radius corner and wall filler panels.)
Worksurface-to-Worksurface with Equipment Rack:
Figure 7C
Note:
This is the connection between a worksurface of equal
height to another worksurface above an equipment rack.
Note:
This is the attachment of a work-
surface to the top of an equipment rack.
Wall filler
panel
Equipment rack
Note:
The cord clips provide cord management when cords and
wires are to be routed to the worksurface from under the console.
Figure 8
Cord clip
0108630R11 Page 8 of 10
Underside of
worksurface
1/4-20 x 15mm
JC bolt
(1 per bracket)
Worksurface
brackets
1/4-20 x 50mm JC bolt
(1 per bracket)
1/4-20 flanged locknut
(1 per bracket-attach
from inside eq rack)
Figure 7B
Worksurface
1/4-20 x 15mm
JC bolt
(4 required)
Equipment rack