background image

Moving the lectern

0107155R1 Page 7 of 10

1.  Before moving the unit, unplug all power cords and retract power cord into the reel (if equipped).

2.  Be sure the casters are in the unlocked position and the doors closed.

3.  Move the lectern slowly and carefully.

4.  Lock the casters after moving.

brake lever

Caster operation

1.  To lock the caster rotation, press the brake lever.

2.  To resume rotation, lift up on the brake lever.

Floor anchoring (toe kick versions only)

1. 

If your Doctorate Lectern is equipped with a toe kick, and you wish to attach it to the floor, the toe-

kick will need to be detached from the lectern. To detach, remove the (4) 1/4-20 x 35mm JC bolts 

(one on each corner) from inside the lectern.  

Figure 7

.  (Save these fasteners).

2.  Carefully lift the lectern off the toe kick and set aside. This will require several people.

3. 

Determine and locate the toe kick into its final position on the floor and mark the (4) mounting hole 

locations on the floor.  (The toe kick mounting holes are 1/2” dia.)

4. 

Drill suitable holes into the floor and anchor the toe kick with appropriate fasteners.

5.  Carefully lift the lectern back onto the toe kick and align the (4) mounting holes.

6.  Re-attach the lectern to the toe kick with the previously removed JC bolts.

7.  The access panel can be removed to access wiring below lectern.

Figure 7

Note: (4) fasteners are req’d to anchor the 

toe kick to the floor.  Due to the wide variety 

of flooring materials and conditions possible, 

anchor fasteners are not provided.

(4) 1/2” mounting 

holes for floor anchors

1/4-20 x 40mm JC bolt

(access from inside lectern)

4 req’d

access 

panel

toe kick

Tools

 

Required

4mm hex 

wrench

Drill

Figure 6

Summary of Contents for Doctorate Lectern 55244

Page 1: ...have any questions please call 1 800 235 1262 To purchase parts or accessories please contact us at www spectrumfurniture com 1 800 235 1262 Thank you for purchasing Spectrum products Spectrum Industr...

Page 2: ...o move lectern Move slowly and carefully when mobile For indoor use only Do not install or store the unit where it will be exposed to weather Keep unit dry For added safety plug the unit into a ground...

Page 3: ...rack rails are factory installed in the Doctorate in the outer position Phillips Screwdriver Tools Required Figure 3 inner rack rail position outer rack rail position Worksurface device installation...

Page 4: ...uired 4mm hex wrench Figure 4B lower audience side panel upper audience side panel 1 4 20 JC bolts 4 per panel The audience side panels can be removed to for easy wiring access Remove JC bolts with 4m...

Page 5: ...his option needs to be ordered separately to complete the overbridge Figure 5A 1 4 20 x 35mm JC bolt overbridge panel Tools Required 1 4 20 x 35mm JC bolt A Identify all location s and sizes for contr...

Page 6: ...tout needs to be relocated to the opposite side of the overbridge Note The Overbridge Control Console has been designed for many of the currently available con trollers on the market however modified...

Page 7: ...ners 2 Carefully lift the lectern off the toe kick and set aside This will require several people 3 Determine and locate the toe kick into its final position on the floor and mark the 4 mounting hole...

Page 8: ...bridge Insert Panel for overbridge version only contact Spectrum to specify cutout size s location s overbridge not available separately includes two 2 grommets w covers 96507 blank panel 96507mod pan...

Page 9: ...97519 Cooling Fans 3RU 19 W x 2 D x 51 4 H Single Fan 97507 Double Fan 97506 Wire Lace Kit 3 lace straps included 95517 Flexible Halogen Light 1RU 19 W x 2 D x 13 4 H 99033 Locking File Drawer 8RU w...

Page 10: ...f Soft Goods Adjustable Height Stacking Wood and Metal Chairs Chair Upholstery Graded In Fabrics and C O M no warranty Height Adjustable Columns and Lifts 1 yr General Use Casters 1 yr Electrical Elec...

Reviews: