background image

Overbridge panel

0120148 Page 7 of 13

Note: The max cutout areas shown are general recommendations only.

The final location of the cutout(s) on the panel will be determined by:

•  The size of the cutout(s)

•  Location preference of each 

device (left, centered, right)

•  The vertical depth of the installed device

•  The available worksurface opening 

under the overbridge on your specific 

Spectrum lectern.

Overbridge 

Section View

Worksurface opening below

2” 

Grommet

Note: The Overbridge Control Console

 has been designed 

for many of the currently available controllers on the market, 

however, modified cutouts should be reviewed by Spectrum 

to ensure clearance of brackets, keyboard slides, or other 

objects under the worksurface.

Contact Spectrum to specify cutout size(s) and location(s).

Cutouts can be made in the blank insert panel by the 

customer after the lectern has been purchased, but are 

only recommended within the cutout area shown.

Max cutout area

Worksurface

Rack Cube

Figure 8B

Figure 8C

Summary of Contents for Director Lectern

Page 1: ...es or if you have any questions please contact us Thank you for purchasing Spectrum products Spectrum Industries Inc 925 First Avenue Chippewa Falls WI 54729 USA 800 235 1262 715 723 6750 www spectrum...

Page 2: ...the lectern into a grounded outlet controlled by a GFI Ground Fault Interrupter circuit breaker Electrical devices are not toys Children are often unaware of the hazards associated with electrical dev...

Page 3: ...led 1 4 20 x 40mm JC bolt install from inside lectern 1 Install 3 piece skirt 1 Attach the two side skirts to the audience side skirt with 4 8 32 x 1 2 PH Thread cutting screws Figure 1A 2 Move lecter...

Page 4: ...elves Remove any items from the top of the worksurface Unlock the casters Push slowly and carefully Do not move over uneven or irregular surfaces Do not allow children to move Lock the casters after m...

Page 5: ...pacing 12 mounting locations available per cube Figure 5B 1 To remove the rack cube open or remove the doors Figure 5A 2 Unscrew the 14 x 7 8 PHSM screws from each cube and slide out Figure 5B Phillip...

Page 6: ...Measuring Device Optional Overbridge Insert Panel Cutouts 1 Before you begin refer to the panel dimensions in Figure 8B for maximum recommended cutout sizes 2 Identify the size and position left cent...

Page 7: ...verbridge Section View Worksurface opening below 2 Grommet Note The Overbridge Control Console has been designed for many of the currently available controllers on the market however modified cutouts...

Page 8: ...loor 4 fasteners are required that will work with the 1 2 diameter holes on the toe kick Due to the wide variety of flooring materials and conditions possible anchor fasteners are not provided 4 1 2 m...

Page 9: ...rear Dimensions 15RU Cube 19 125 W 48 58 cm x 19 031 D 48 34 cm x 26 625 H 67 63 cm Dimensions 13RU Cube 19 125 W 48 58 cm x 16 031 D 40 72 cm x 28 H 71 12 cm Cooling fan mounts Compatible with most...

Page 10: ...kg Shipping weight 14 lb 6 4 kg Keyboard Tray 55386 Installed centered using pre drilled mounting holes under the worksurface Can be used as a keyboard tray or flipped and used as a storage drawer Wir...

Page 11: ...center mounted worksurface or overbridge components Unit weight 6 5 lb 3 kg Shipping weight N A Overbridge Insert Panel 96510 Blank panel 96510mod Panel with cutout s Panel for overbridge version onl...

Page 12: ...rd at any length up to 15 cUL listed The cord reel is intended to provide temporary access to electrical outlets for Spectrum mobile lecterns Check local electrical codes prior to installation Cutout...

Page 13: ...Y SPECTRUM FOR THE PRODUCT AT ISSUE AND RECALLACTION EXPENSES SPECTRUM SHALL NOT BE SUBJECT TO ANY OTHER OBLIGATIONS OR LIABILITIES WHETHER ARIS ING OUT OF BREACH OF CONTRACT WARRANTY TORT INCLUDING N...

Reviews: