background image

0120148 Page 6 of 13

Figure 7A

Optional Flip-up Shelf

Shelf grommet

Operation

The shelf will automatically lock into place when lifted into the 

horizontal position with the levers released.  To lower or flip-up the 

shelf, press and hold the levers under each folding shelf bracket at the 

same time while slowly lowering or raising the shelf.  Do not exceed a 

maximum of 35 lb of weight on the shelf.  Do not move the unit while 

the shelf is in the horizontal position.
Note:  Power and communication wiring for document cameras, laptop 

computers, and / or projectors placed on the flip-up shelf should be routed 

on top of the audience-side of the shelf.  Use of the shelf grommet hole for 

wiring will result in pinching of the cords when the shelf is lowered.

CAUTION

Keep clear of pinch points during shelf movement.  

Do not exceed 35 lb [15.9 kg] of weight on shelf.

Release lever 

(press here)

Upper mounting position

Lower mounting position

Figure 7B

Tools Required

4mm Hex 

Wrench 

(included)

Jigsaw or router

Drill

Pencil

Masking 

tape

Drill bit

Measuring 

Device

Optional Overbridge Insert Panel Cutouts

1.  Before you begin, refer to the panel dimensions in 

Figure 8B

 for 

maximum recommended cutout sizes.

2.  Identify the size and position (left, centered, or right) of each cutout 

needed.

3.  Identify the depth of your device to verify it will not interfere with the 

worksurface or any other objects under the overbridge when the 

panel is attached.  

Figure 8C

.

4.  When the cutout location(s) have been determined, locate and mark the 

exact cutout area(s) on the panel with a pencil.  

Note: Using masking 

tape on cut lines will minimize laminate chipping while cutting.

5.  Carefully make the cutout(s) in the panel using a jigsaw or router.

6.  Set the panel into the overbridge frame opening.  Note: It may be 

necessary in some cases to install the electronic device into the 

panel before attaching the panel to the overbridge.

7.  Secure with (2) 1/4-20 x 35mm JC bolts and tighten securely.

8.  Install (2) 2” grommets.

1/4-20 x 35mm 

JC bolt

(2 required)

Overbridge 

panel

Overbridge frame

2” grommet

Note: The overbridge panel is symmetrical.  Rotating or flipping the 

panel 180° and re-attaching to the overbridge will allow you to place the 

cutout on the opposite side of the overbridge if necessary.

Figure 8A

Summary of Contents for Director Lectern

Page 1: ...es or if you have any questions please contact us Thank you for purchasing Spectrum products Spectrum Industries Inc 925 First Avenue Chippewa Falls WI 54729 USA 800 235 1262 715 723 6750 www spectrum...

Page 2: ...the lectern into a grounded outlet controlled by a GFI Ground Fault Interrupter circuit breaker Electrical devices are not toys Children are often unaware of the hazards associated with electrical dev...

Page 3: ...led 1 4 20 x 40mm JC bolt install from inside lectern 1 Install 3 piece skirt 1 Attach the two side skirts to the audience side skirt with 4 8 32 x 1 2 PH Thread cutting screws Figure 1A 2 Move lecter...

Page 4: ...elves Remove any items from the top of the worksurface Unlock the casters Push slowly and carefully Do not move over uneven or irregular surfaces Do not allow children to move Lock the casters after m...

Page 5: ...pacing 12 mounting locations available per cube Figure 5B 1 To remove the rack cube open or remove the doors Figure 5A 2 Unscrew the 14 x 7 8 PHSM screws from each cube and slide out Figure 5B Phillip...

Page 6: ...Measuring Device Optional Overbridge Insert Panel Cutouts 1 Before you begin refer to the panel dimensions in Figure 8B for maximum recommended cutout sizes 2 Identify the size and position left cent...

Page 7: ...verbridge Section View Worksurface opening below 2 Grommet Note The Overbridge Control Console has been designed for many of the currently available controllers on the market however modified cutouts...

Page 8: ...loor 4 fasteners are required that will work with the 1 2 diameter holes on the toe kick Due to the wide variety of flooring materials and conditions possible anchor fasteners are not provided 4 1 2 m...

Page 9: ...rear Dimensions 15RU Cube 19 125 W 48 58 cm x 19 031 D 48 34 cm x 26 625 H 67 63 cm Dimensions 13RU Cube 19 125 W 48 58 cm x 16 031 D 40 72 cm x 28 H 71 12 cm Cooling fan mounts Compatible with most...

Page 10: ...kg Shipping weight 14 lb 6 4 kg Keyboard Tray 55386 Installed centered using pre drilled mounting holes under the worksurface Can be used as a keyboard tray or flipped and used as a storage drawer Wir...

Page 11: ...center mounted worksurface or overbridge components Unit weight 6 5 lb 3 kg Shipping weight N A Overbridge Insert Panel 96510 Blank panel 96510mod Panel with cutout s Panel for overbridge version onl...

Page 12: ...rd at any length up to 15 cUL listed The cord reel is intended to provide temporary access to electrical outlets for Spectrum mobile lecterns Check local electrical codes prior to installation Cutout...

Page 13: ...Y SPECTRUM FOR THE PRODUCT AT ISSUE AND RECALLACTION EXPENSES SPECTRUM SHALL NOT BE SUBJECT TO ANY OTHER OBLIGATIONS OR LIABILITIES WHETHER ARIS ING OUT OF BREACH OF CONTRACT WARRANTY TORT INCLUDING N...

Reviews: