background image

Important

Before using this product:

•  Read this manual

•  Comply with all safety and operating instructions

•  Ensure all parts and correct quantities are included

Any parts damaged during shipment must be reported 

within 5 days of receipt.  To report information regarding 

missing parts or damage, to purchase parts or acces-

sories, or if you have any questions, please contact us.

Thank you for purchasing Spectrum products!

Spectrum Industries, Inc

925 First Avenue, Chippewa Falls, WI 54729 USA

800 235 1262

715 723 6750

www.spectrumfurniture.com

Owner’s Manual

0120148 Page 1 of 13

Director Lectern

55213

Shown with surround, 

metal side panels, and 

centered keyboard tray

Shown with Overbridge Control 

Console, laminate side panels, 

and centered keyboard tray

Shown with plain worksurface, 

metal side panels, and 

centered keyboard tray

Media Manager Series

Summary of Contents for Director Lectern

Page 1: ...es or if you have any questions please contact us Thank you for purchasing Spectrum products Spectrum Industries Inc 925 First Avenue Chippewa Falls WI 54729 USA 800 235 1262 715 723 6750 www spectrum...

Page 2: ...the lectern into a grounded outlet controlled by a GFI Ground Fault Interrupter circuit breaker Electrical devices are not toys Children are often unaware of the hazards associated with electrical dev...

Page 3: ...led 1 4 20 x 40mm JC bolt install from inside lectern 1 Install 3 piece skirt 1 Attach the two side skirts to the audience side skirt with 4 8 32 x 1 2 PH Thread cutting screws Figure 1A 2 Move lecter...

Page 4: ...elves Remove any items from the top of the worksurface Unlock the casters Push slowly and carefully Do not move over uneven or irregular surfaces Do not allow children to move Lock the casters after m...

Page 5: ...pacing 12 mounting locations available per cube Figure 5B 1 To remove the rack cube open or remove the doors Figure 5A 2 Unscrew the 14 x 7 8 PHSM screws from each cube and slide out Figure 5B Phillip...

Page 6: ...Measuring Device Optional Overbridge Insert Panel Cutouts 1 Before you begin refer to the panel dimensions in Figure 8B for maximum recommended cutout sizes 2 Identify the size and position left cent...

Page 7: ...verbridge Section View Worksurface opening below 2 Grommet Note The Overbridge Control Console has been designed for many of the currently available controllers on the market however modified cutouts...

Page 8: ...loor 4 fasteners are required that will work with the 1 2 diameter holes on the toe kick Due to the wide variety of flooring materials and conditions possible anchor fasteners are not provided 4 1 2 m...

Page 9: ...rear Dimensions 15RU Cube 19 125 W 48 58 cm x 19 031 D 48 34 cm x 26 625 H 67 63 cm Dimensions 13RU Cube 19 125 W 48 58 cm x 16 031 D 40 72 cm x 28 H 71 12 cm Cooling fan mounts Compatible with most...

Page 10: ...kg Shipping weight 14 lb 6 4 kg Keyboard Tray 55386 Installed centered using pre drilled mounting holes under the worksurface Can be used as a keyboard tray or flipped and used as a storage drawer Wir...

Page 11: ...center mounted worksurface or overbridge components Unit weight 6 5 lb 3 kg Shipping weight N A Overbridge Insert Panel 96510 Blank panel 96510mod Panel with cutout s Panel for overbridge version onl...

Page 12: ...rd at any length up to 15 cUL listed The cord reel is intended to provide temporary access to electrical outlets for Spectrum mobile lecterns Check local electrical codes prior to installation Cutout...

Page 13: ...Y SPECTRUM FOR THE PRODUCT AT ISSUE AND RECALLACTION EXPENSES SPECTRUM SHALL NOT BE SUBJECT TO ANY OTHER OBLIGATIONS OR LIABILITIES WHETHER ARIS ING OUT OF BREACH OF CONTRACT WARRANTY TORT INCLUDING N...

Reviews: