SafEye
™
™
Series 200 IR Gas Detector - User’s and Maintenance Manual
SPETCREX INC.
Doc. No. TM792100, Rev. B, Oct 1997
- 29 -
2. 4. 4.
Duct Mount Installation (Figures 2-3, 2-4)
The following instructions are applicable for both the Flash Source unit and the
Detector unit.
1. Insert the first Internal Plate (1) through the Air Duct Hole. Hold it by hand and
press the Base Plate Gasket (2) to the Installation Surface against the Internal Plate.
The Internal Plate Screws should be inserted into the Gasket holes and hold it from
falling. Then remove your hand and repeat the process for the second Internal Plate.
2. Attach the Base Plate (3) to the Gasket (2) carefully. The Internal Plate screws
should be inserted slightly to the Base Plate holes.
3. Secure the Base Plate to the Installation Surface using four Nuts and Flat
Washer (4).
4. Attach the Window Plate (5) by threading its holes on the Base Plate Screws. The
Window (7) Protection Ring of the plate should be directed outside. Secure it by
four Nuts and Flat Washers (6).
5. Alignment Plate installation: Screw together the Internal Vertical Alignment Nut and
the Washer (9) to the Base Plate Screws. Then thread the Alignment plate (8) on the
screws. Connect the two External Alignment Nuts and Flat Washers (10) without
fastening. The Plate is now connected.
6. Connect the Horizontal Alignment Screw with the Nut and Flat Washer (11)
directed according the illustration. The Alignment plate should be hold but free for
alignment.
At this position the Duct Mount is ready for alignment.