background image

SpectraPure

SpectraPure®Inc.

  

480.894.5437   Call us toll-free  1.800.685.2783    

215 South Industrial Drive,   Suite 2A   Tempe, Arizona   85281-2941

®

8

Diagnostics & 

System Maintenance

Deionization Cartridges #3 and #4 Diagnostic

The third and fourth stages are dual layer cation/anion cartridges, or in 

some cases a mixed bed DI. The condition of these cartridges should be 

judged by observing either a RED or GREEN light indication from the moni-

tor. Please note that the probe is located between  stages #3 and #4. Thus, 

the monitor indicates the condition of the third stage cartridge, only.
Turn the on the system and allow water to flow past the monitor probe 

for at least 20 minutes before attempting to use the monitor. The monitor 

will indicate GREEN when the cartridge is in good condition and RED if it is 

exhausted and in need of replacement. (Be sure that switch #7 is in the ON 

position and all other switches are OFF.)
Replace the third stage cartridge

 immediately

 if the  RED light is on. 

Note: In addition to the monitor indicating the DI cartridge condition, the 

resin will also change color. Note that only the DI-AR-CI-10 cartridge is color 

indicating, not the lab grade mixed bed cartridge that is sometimes used. 
The DI-AR-CI-10 cartridge’s violet-colored layer is the resin layer used to indi-

cate exhaustion and will change to an orange color when exhausted. The 

standard cartridge will change color from bottom to top while the “down-

flow” version will change from top to bottom.
The color change that occurs in this stage gives a general indication of 

its condition but the monitor will provide the most accurate diagnosis of 
its condition. There may be local conditions that affect the color-changing 
characteristics of these DI cartridges. High pH water may prevent these car-
tridges from changing colors.

Deionization Cartridges #3 and #4 Replacement 

Materials Needed:

 One DI-AR-CI-10 Deionizaton cartridge, filter wrench.

Procedure:

1.  Remove the filter housing from Stage #3 by unscrewing it counter
 

clockwise as viewed from the bottom.

2.  Remove and discard the old cartridge from the housing.
3.  Remove the housing and cartridge from Stage #4 and re-install the 
 

cartridge in Stage #3 Make sure the cartridge is installed in the correct 

 

direction as marked on the filter housing and that the

 top seal

 is 

 

securely attached to the top of the cartridge.

SpectraPure

®

SpectraPure®Inc

 Fax  480.894.6109 Fax us toll-free 1.877.527.7873

E-mail: [email protected] Visit us on the web www.spectrapure.com

5

Installing the Water Purity Monitor

1.  Remove front cover from the monitor and connect the supplied 
 

9-volt battery to the snap terminals located on the circuit board. 

 

Support the battery terminals with your finger while inserting the 

 

battery. For proper operation use only an ALKALINE type battery.

2.  Insert the plug from the test probe cable into the socket on the 
 monitor 

box.

3.  Locate switch #7 on the selector switch. Slide (or push-in) the 
 

switch  to the ON position. Ensure that all remaining switches are 

 

in the OFF position. This is the recommended setting to determine 

 

the condition of DI cartridges.

4.  Replace the front cover and fasten with the included screw. Locate 
 

monitor at an easily accessible location within 3 feet of the test 

 

probe. Attach by peeling the protective cover from the self-adhesive

 

velcro tape and pressing onto the mounting surface.

5.  Locate the 8-position “dip switch”. Each of the internal settings
  

corresponds to a specific electrical conductivity level measured in 

 

micro-siemens (uS). The equivalent “natural water” TDS setting in 

 

ppm is shown below.

System Start-Up

Switch 

Number 1 2 3 4 5 6 7 8

Setting in uS 

100  50 

20 

10  5 

0.5

Setting in ppm 

67 

33 

13 

6.7  3.3 

1.3  0.67  0.33

Fig. C: Purity Monitor Switches

Switch #7 
Shown in “ON” 
Position

* If settings are changed for any reason (such as testing the quality of 
RO membrane), it should be returned to the original #7 setting after 
completion of the test.

Summary of Contents for The Ultimate DI System

Page 1: ...ro rated the performance of membrane elements for one year from date of receipt by the buyer providing that the loss of performance was not caused by fouling neglect or water conditions exceeding the feed water parameters listed on page 3 of this manual Most municipal water supplies meet these requirements Terms and Conditions of Sale 1 To obtain service under this warranty the defective system or...

Page 2: ...nates contaminant leakage from exhausted DI cartridges with the addition of secondary back up cartridges An exhausted deionization cartridge will leach the removed impurities back into the water at levels many times higher than originally found in the source water The addition of the two secondary DI stages prevents this leakage When the first SilicaFree Cartridge DI SFCC 10 changes color upon exh...

Page 3: ... contaminated product water due to exhausted cartridges is completely eliminated With the majority of contaminants now removed by Stages 1 and 2 the water is then passed through two additional stages of DI resin Stages 3 and 4 have our Chloramine Removal Car tridges DI AR CI 10 They will provide longer life than standard mixed bed cartridges when used to treat water containing chlorine chloramine ...

Page 4: ...tween GREEN and RED between successive depressions of the push to test water purity monitor A Do not press the push to test button rapidly in quick succes sion Wait at least 1 minute between two successive depressions of the button for an accurate reading Q How should the probe be mounted for an accurate reading A The probe should be mounted VERTICALLY at the bottom of the T Q How long does the ba...

Page 5: ...Needed One DI AR CI 10 Deionizaton cartridge filter wrench Procedure 1 Remove the filter housing from Stage 3 by unscrewing it counter clockwise as viewed from the bottom 2 Remove and discard the old cartridge from the housing 3 Remove the housing and cartridge from Stage 4 and re install the cartridge in Stage 3 Make sure the cartridge is installed in the correct direction as marked on the filter...

Page 6: ...rapure com Visit us on the web www spectrapure com 7 The Ultimate DI System has been engineered to provide fool proof operation and double assurance that contaminants will not be intro duced into the product water except in cases of extreme negligence The design theory to remember is that the cartridges will be replaced in a rotational pattern Stages 1 and 3 will always exhaust their capacity firs...

Reviews: