SpectraPure
®
SpectraPure®Inc.
480.894.5437 Call us toll-free 1.800.685.2783
2167 East Fifth St, Tempe, Arizona 85281
7
SETUP PROCEDURES
STEP 1: Unscrew the third position housing (MaxCap
®
DI) and the fourth position housing (SilicaBuster DI) from the
system and remove the DI Cartridges. Then, reinstall the empty housings back onto the system.
STEP 2: Connect the 1/4" Black Line to the cold water line by using either the garden hose adapter, which is provided
with the system, or a Feed Water Adapter.
STEP 3: INSTALLATION USING THE HIGH & LOW FLOAT SWITCHES and BULKHEAD FITTINGS:
A. Install both the High and Low Floats onto a open container, such as a Rubbermaid
®
trash can. The floats can
be mounted by drilling a 5/8" hole.
(The High Float shuts down the system, while the Low Float turns the system on).
B. Connect the floats to the “Y” adapter.
C. Attach the 3-pin connector on the float switches to the UHE CONTROL MODULE.
NOTE: Floats are to be mounted horizontal when dry and float up when wet. In most instances we recommend
locating the low float approximately halfway down your reservoir. DO NOT OVERTIGHTEN when
installing the floats.
NOTE:
Floats must be installed in the FRESH WATER storage container.
This system MUST be connected to the floats to operate the Flush Cycle.
Failure to install the pure water flush connection for this unit will void any warranty.
STEP 4: For now, direct both the 1/4" blue (product or permeate) line and the yellow (waste or concentrate) line to drain.
STEP 5: Open the cold water (tap water) feed, connected to the black line. Plug in the 24 V transformer to the UHE
Module and connect to 120VAC power.
Feed Water
Adapter
Garden Hose
Adapter