SpectraLink Corporation
Installation
Link WTS – Link 3000 MCU
The system administrator’s tasks are minimal but may take up to two hours per week for
a large system. The system administrator should have access to the location of the
SpectraLink system and be competent to perform the following functions:
Swap system components (Wireless Telephones, Base Stations)
Swap an Interface Module
Perform or direct basic moves, adds and changes to a telephone system
Perform or direct the receiving and shipping of components
Train users with video and handouts
The system administrator should be available for training at the time of the SpectraLink
installation. The system administrator is given unlimited access to the SpectraLink 800
customer support line for additional assistance.
Union Labor
In some areas strict labor union rules will preclude the SpectraLink representative’s
ability to install the equipment without union assistance. If such rules are in force in the
local area, the customer must ensure that sufficient union help is available at the
scheduled installation time to carry out the following functions:
•
Install Base Stations
•
Move and reinstall Base Stations
•
Make cabling changes at cross-connect blocks
•
Run cables
•
Make and modify electrical connections
3.2. Prepare Location for Shelves
The MCU, composed of up to 20 shelves and one Intershelf Junction Panel, is usually
installed in or near the telephone equipment room. If this is not possible, the MCU can be
located anywhere that the telephone system lines are accessible.
The number and arrangement of the system shelves depends on the size and configuration
of the system.
System Controller
Part Number
Shelves
Supported
Base Stations
Supported
Users
Supported
CSC301/ CSO301
1
60
160
CSC306/ CSO306
6
360
960
CSC320/ CSO320
20
1,000
3,200
Consideration should be given to:
Environmental conditions. The system outputs 28 BTUs per hour, per interface
module.
Part Number: 72-0059-01-Ha.doc
Page 19