
Replace a Boot Drive in the Verde 2U Master Node
Replace a Boot Drive
October 2013
Boot Drive Replacement
—
Spectra nTier Verde Array
20
7.
To
complete
the
replacement,
you
must
reboot
the
nTier
Verde
2U
master
node.
Use
the
following
instructions
to
reboot
the
array.
a.
From
any
screen
of
the
StrataView
interface,
click
the
Power
icon
in
the
lower
right
‐
hand
corner.
The
Power
screen
displays.
b.
Click
Reboot
.
A
confirmation
screen
appears.
Click
Reboot
in
the
confirmation
screen
to
reboot
the
array.
8.
Wait
approximately
5
minutes
for
the
array
to
initialize,
then
continue
to
.
Figure 22
The Power icon.
Power icon