Plumbing Installation
(Continued)
Install the blanking plug
supplied in the install
kit into the now open
port on the gauge tee.
Using the tubing supplied in the install kit, con-
nect the 3/8” tube on the discharge of the fresh
water flush solenoid and route it to the tee on the
accumulator check valve assembly.
Cut tubing and install end fitting.
See Parker assembly instructions next page.
Make sure that the tubing on the accumulator
is secure as this will be below the waterline.
Summary of Contents for Z-Ion Catalina 300 Mk II
Page 2: ......