background image

Plumbing Installation 

Installation should always be carried out by a qualified technician to avoid 
problems and ensure warranty coverage. 

Turn off the domestic fresh water pump and bleed any re-
maining pressure in the pipes. 

Fresh Water Flush 
Module 

Remove the existing Fresh Water Flush Module 
from the system.  Disconnect the inlet and dis-
charge hoses, and label them as “Inlet” and 
“Discharge” accordingly. 

Install the Z-Ion Flush Module in the same location as 
the Fresh Water Flush Module and reconnect the hoses 
in the corresponding location. 

Inlet 

Discharge 

Discharge 
To tee assembly 

Z-Ion Flush Module

Summary of Contents for Z-Ion Catalina 300 Mk II

Page 1: ...Z Ion Installation and Retrofit Instructions Catalina 300 Mk II Katadyn Desalination LLC Spectra Watermakers PH 415 526 2780 FX 415 526 2787 www spectrawatermakers com Revised 06 01 13...

Page 2: ......

Page 3: ...r sources pickling chemicals or complex procedures The whole operation is completely automatic controlled by your MPC control and the Z iON cir cuit When properly installed and maintained it will prot...

Page 4: ...pressure in the pipes Fresh Water Flush Module Remove the existing Fresh Water Flush Module from the system Disconnect the inlet and dis charge hoses and label them as Inlet and Discharge accordingly...

Page 5: ...acock Cut inlet hose between the intake seacock and the strainer and install the accumulator check valve assembly Make sure that the check valve is oriented properly Securely tighten the hose clamps a...

Page 6: ...and ac cumulator tank Feed Pump Module Remove the black 3 8 fresh water flush tube from the back of the tee fitting at the inlet to the feed pump Note the fitting is located be hind the pressure sens...

Page 7: ...bing supplied in the install kit con nect the 3 8 tube on the discharge of the fresh water flush solenoid and route it to the tee on the accumulator check valve assembly Cut tubing and install end fit...

Page 8: ...Parker tube assembly instructions...

Page 9: ...Locate the DC Bus Bar as shown below which is the main power feed for the watermaker Incoming DC Bus Bar Connect the DC power leads from the Z Ion Control Box to the Incoming DC Bus Bar Pay attention...

Page 10: ...o the end of the flush cycle take a sample of the brine discharge If the discharge thru hull isn t accessible you will need to use the brine discharge service hose to gain access to the system Once yo...

Page 11: ...0 48 VDC inlet voltage 10 38V output 1 5A Current controlled Polarity reverses every 10 15 seconds adjustable Timed auto shutoff adjustable Current output is field adjustable Operation The unit can ha...

Reviews: