SpaceraiL Spacewarp Level 2.1 Instruction Manual Download Page 9

9

[R1] Rail

[R1] Rail

[R1] Rail

[A1] Arm

[R2] Rail joining

Insert rails into arm

Use rail stands like railway ties

Install the arms in an inclined position to each other to create steep sections

The distance between the arms should be between 8 to 10cm. 
When the distance is larger, rail stands [A6] have to be installed

8

15

17

18

19

16

Installation of the rails

Insert the rails into the arms 

(fg. 15+16)
Rail joining (fg. 17)
Adjust and connect the rails. 

Insert the rail joinings [R2] into 

the holes at the center of the 

rails (fg. 17)

Information about rail stands 

(fg. 18)
The distance between the 

arms shouldbe between 8 to 

10cm to ensure best stability. 

When the distance is larger, 

rail stands [A6] have to be 

installed

Attach rail stands in steep 

sections and elevator entry/

exit points to ensure best 

stability of the rails
Steep sections (fg. 19)
Install the arms in an inclined 

position to each other to 

create steep sections, so 

that the steel balls can run 

smoothly (fg. 19)

Assembly of the rails

Summary of Contents for Spacewarp Level 2.1

Page 1: ...InstructionManual Level 2 1...

Page 2: ...g s P 12 SpaceRail is a spectacular marble roller coaster that guarantees high speed action rides consisting of wild rotations daring loops and seesaw swivel stunts These marble roller coasters are an...

Page 3: ...3 These images show the SpaceRail Level 2 1 from multiple angles They will be helpful while you are building Front Left Top Right Back...

Page 4: ...right positionofthearm Approx 55m m A5 Armw rench A 1 Arm A4 Arm halterB A4 ArmholderB Holeprofle Holeprofle Holeprofle Holeprofle A2 Arm halterA A2 ArmholderA T op dow nv iew T op dow nv iew A3 Armtu...

Page 5: ...oper locationsoftheelev atorrings 5 Insertthe4shaftsintothe elev atorcov er fg 06 5 T ake carethattheshaftsareproperly located 6 Nowattach3rail stands A 6 to theelev atorring fg 06 6 06 1 06 2 06 3 06...

Page 6: ...scaleof1 1 Positionsofarm s fg 07 Shaftsareshow ninascale of1 1 A ttachthearm stothe ex actpre defnedredpositions Pleasenotethecorrectorderand directionsofarm s Inserttheshaftintoarmholder B Insertthe...

Page 7: ...S1 Shaft300m m S2 Shaft200m m S2 Shaft200m m Pleasenotethecorrectpositionsanddirectionsofarm s seeabov e Seesaw m ountlefthandside Seesaw m ountlefthandside Seesaw m ountrighthandside Back Armpositio...

Page 8: ...herw iththerails pag e9 D uetothelongdistance theinstallationofthis sectionisdiv idedinto2assem blysteps please refertofg 12 1 12 2 Fig 12 1an d12 2sh owth eu ppe ran dlow e rtracklay ou t Fig 12 1 Fr...

Page 9: ...rm s fg 15 16 Railjoining fg 1 7 A djustandconnecttherails Inserttherailjoining s R2 into theholesatthecenterofthe rails fg 1 7 Inform ationaboutrailstands fg 18 T hedistancebetw eenthe arm sshouldbeb...

Page 10: ...s ta lla tio no fth era ils D istancebetw eenrails fg 20 Installtherailstandtokeep railsparallel Curv es fg 21 22 Curv esneedtobeassem bled inacertainang letoprev ent steelballsfromm issingthe turn f...

Page 11: ...onoftheentry andex it fg 26 Install railsascloselyaspossibletotheentryand ex itoftheelev atortoensurethesteel ballsrunning sm oothly fg 26 Payattentiontoacorrectangleoftherailsw henthe steelballsenter...

Page 12: ...iolentjam m ing stopping duringoperationm aydam agethem otor Donotcum berthe elev ator Alw aysstoreandoperatetheball rollercoasteratasafeplace Besuretocheckbatteryregularlytoensureaproperoperationoft...

Reviews: