
BMK-8 U /
BMK-12 W
40
• Make sure that the gun does not tilt, i.e. that the ceramic ferrule is positioned evenly on the
workpiece.
• Start welding process. The LED "Final contact" lights up after completion.
• After completion of the welding process, the welding gun or welding head should be held in position
for about 5 seconds to allow solidification of the molten metal.
• Remove gun vertically to prevent widening and damaging of the stud holder.
• Knock off ceramic ferrule from the welded area.
R