13
Southworth Products
DDL Dock Lift Manual
4.1
External Power Unit
External power units should be placed within thirty feet (hose length) of the machine to avoid
excess pressure drops. External power units must be protected from moisture and weather.
4.2
Pit Installation
Do not install this machine in a pit unless the machine has been designed for such
installation. Shear points exist and can cause severe injury. Platforms traveling
below floor level may require guarding in accordance with ANSI MH 29.1. Guarding
must be installed before operation.
1. Verify that the pit dimensions match the pit plan.
2. Verify that pit is clear of tools and other debris before lowering the machine into the pit.
3. Follow General Installation instructions to complete the installation.
4.3
Typical Pit Plan
The information in this manual is for our standard machines, if you have any questions
regarding the specifications and dimensions of your actual lift table, contact Southworth
Customer Service or Southworth Sales if your order is being quoted or is in process.
FROM ANY DIRECTION
INCLUDING ENTRY FROM
BOTTOM OF PIT SUMP.
STEP REQUIRED FOR BRIDGE
PLATE HINGE CLEARANCE
MUST BE SQUARE ( 1/2")
ACROSS CORNERS.
3" X 3" X 1/4" ANGLE BY
PIT CONTRACTOR. ALL
CORNERS TO BE
SECURELY WELDED. PIT
CONDUIT ENTRY CAN BE
COUPLINGS FOR
HYDRAULIC
CONNECTIONS
1 1/2"
BRIDGE
+1-1/2"
PLATFORM 1-1/2"
WIDTH
1/2"
BRIDGE PLATE
PLATFORM
PLATE
WIDTH
+1/2"
2" CONDUIT
VOIDS
COMPACTED WITH NO
ANGLES MUST BE WELL
CONCRETE BEHIND CURB
FRONT OF PIT
ALIGNED WITH
CONCRETE ANCHORS TO
BOLLARDS TO BE
CENTER LINE OF
FROM EACH END.
12" O.C. WITH ONE 3"
1/2" X 6" LOCATED
PREVENT STANDING WATER
PIT DRAIN AS REQUIRED TO
BE
IN PIT. (BY CONTRACTOR)
CROSS HATCHING INDICATES AREAS OF
•
BASE FROM THE MUST BE SHIMMED AND
OR GROUTED AFTER LEVELING OF THE
BASE FRAME TO ENSURE PROPER BASE
FRAME SUPPORT.
CONDUIT RUN IS REQUIRED FOR ROUTING
•
OF HYDRAULIC HOSES AND ELECTRICAL
WIRING UNLESS ALTERNATIVE
ARRANGEMENTS ARE REQUESTED.
2" ELECTRICAL CONDUIT USED WHEN 1/2"
•
HYDRAULIC HOSE, VENT LINE, AND
ELECTRICAL LEADS ARE TO BE INSTALLED
FROM POWER UNIT TO LIFT (BY PIT
CONTRACTOR).
8" BOLLARDS
36"
STEEL PIPE FILLED
48"
1/2"
3"
6"
+1/2"
HEIGHT
LOW
(BY CONTRACTOR)
WITH CONCRETE
1/2" SHIM
UNDER EACH
LAG PLATE FOR
PROPER DRAINAGE
Ø3/4” LAG HOLES FOR
Ø5/8” ANCHORS WITH
MIN. 2000 LB PULL
OUT. (BY INSTALLER)