![Southwire Maxis XD10 Operating Instructions Manual Download Page 8](http://html1.mh-extra.com/html/southwire/maxis-xd10/maxis-xd10_operating-instructions-manual_1337704008.webp)
8.5H x 5.5”W
SETUP AND OPERATION
13
14
SETUP AND OPERATION
OVERHEAD PULL cont.
7. Adjust front roller pivot (6) by
removing pin and positioning to
proper angle saving pin to install
at a later step. (Fig 30)
8. Use manual hand crank on elevation control (21) to manually adjust
puller to proper position in conduit. The use of 18 volt drill on low
setting with 7/16 nut driver can be used to adjust puller position.
9. Replace Front Extension
Hitch Pin (10) and
Front Roller Hitch Pin (8)
into desired angle. (Fig. 31)
(Fig. 30)
(Fig. 31)
Drill should be in low gear with clutch engaged to prevent damage
to gearing and prevent wrist injury.
CAUTION:
OVERHEAD PULL cont.
10. Use manual hand crank on
elevation control (21) to lift
front end assembly and insert
conduit adaptor into conduit
or lift higher into panel can
(refer to Fig. 8). (Fig.32)
11. Make sure all hitch pins are
secure with a locking cotter
pin. (Fig. 33)
12. Route rope through conduit
adaptor and under front roller (7),
then position rope under forward
mid-frame roller followed by
back mid-frame roller and onto
the capstan (19). (Fig. 34).
13. Wrap rope around the capstan (19) in a counter-clockwise direction,
working from the base of the capstan to top.
14. Do not stand in line (in front or behind) with the rope being pulled
(stand to the side of the puller) to avoid injury if the rope breaks.
(Fig. 33)
(Fig. 34)
(Fig. 32)
Once conduit adapter is
seated in conduit, use elevation control
handle to release tension off puller and
elevation control to prevent possible
damage to elevation control.
CAUTION: