8.5H x 5.5”W
8
SETUP AND OPERATION
7
SETUP AND OPERATION
PULLING OUT OF THE GROUND OR PANEL cont.
PULLING OUT OF THE GROUND OR PANEL cont.
4. Pull Mid–Frame Hitch Pin and telescope mid-frame to desired
length and reinstall pin. (Figs. 10, 11)
5. Use manual hand crank on elevation control (21) to manually adjust
puller to elevated position by turning clockwise.
The use of an 18-volt drill on low setting with 7/16 nut driver can be
used to raise puller to elevated position.
9. Use manual hand crank on elevation control (21) to manually adjust
puller to proper position in conduit. The use of an 18-volt drill on
low setting with 7/16 nut driver can be used to adjust puller position.
11. Replace Front Extension Hitch Pin (10) and Front Roller Hitch Pin (8
into desired angle. (Figs. 16, 17)
6. Pull front extension hitch pin (10)
and adjust front extension to
desired angle.
Save pin to reinstall at a later
step. (Fig. 12)
7. Adjust front extension (9) to
proper length by removing pin
and sliding arm extension
inward or outward and save
pin to reinstall at a later step.
(Fig. 13)
Drill should be in low gear with clutch engaged to prevent damage
to gearing and prevent wrist injury.
CAUTION:
Drill should be in low gear with clutch engaged to prevent damage
to gearing and prevent wrist injury.
CAUTION:
8. Adjust front roller pivot (6)
by removing pin and positioning
to proper angle.
(Fig.14)
(Fig. 11)
(Fig. 12)
(Fig. 13)
10. Lift Front End Assembly by
use of manual hand crank on
elevation control (21) and lower
conduit adaptor into conduit.
(Fig.15)
(Fig. 14)
(Fig. 15)
(Fig. 16)
(Fig. 17)
(Fig. 10)
(Fig. 10)
Once conduit adapter is
seated in conduit, use elevation control
handle to release tension off puller and
elevation control to prevent possible
damage to elevation control.
CAUTION: