![Southwire Maxis XD10 Operating Instructions Manual Download Page 6](http://html1.mh-extra.com/html/southwire/maxis-xd10/maxis-xd10_operating-instructions-manual_1337704006.webp)
8.5H x 5.5”W
SETUP AND OPERATION
9
10
SETUP AND OPERATION
PULLING OUT OF THE GROUND OR PANEL cont.
12. Make sure all hitch pins are secure
with a locking cotter pin. (Fig. 18)
PULLING OUT OF THE GROUND OR PANEL cont.
16. Plug puller power cord into pigtail
adaptor, then plug pigtail adaptor
into foot switch and plug into the
power source. (Fig. 20)
Drill should be in low gear with clutch engaged to prevent damage
to gearing and prevent wrist injury.
CAUTION:
(Fig. 18)
(Fig. 20)
13. Route rope through conduit adaptor
and over front roller (7), then position
rope
over
main roller followed by back
mid-frame roller and onto the capstan
(19). (Fig. 19)
14. Wrap rope around the capstan (19) in a counter-clockwise
direction, working from the base of the capstan to the top.
15. Do not stand in line (in front or behind) with the rope being
pulled (stand to the side of the puller) to avoid injury if the
rope breaks.
17. Prior to starting motor ensure motor
is set on desired gear position using
the high/low switch (2). (Fig. 21)
(Fig. 21)
18. Start the electric motor by
depressing foot switch.
(Fig. 22)
19. Pull on the rope to produce some tension.
The rope will begin to advance.
(Fig. 22)
(Fig. 19)
High
MOTOR SWITCH
Low