background image

7

INSTALLATION STEPS 

FOR EZ MOUNT PANELS

7

8

9

Place spacer over screw and fasten to wall. 

Repeat process until all 4 are in position.

!! DO NOT OVER TIGHTEN SCREW

AS MAGNET WILL SHATTER !!

From attic, drill hole for 

cable drop through.

Connect your RJ45 Quick connect cable from the ceiling to the 

IN

 port of your first 

first star panel. Take your next RJ45 cable and connect to the 

OUT

 port and hang 

o

ff

 to the side for your next panel

NOTE:

 Remember to 

always connect your 

next panel cables to 

the proper ports!  

OUT to IN.

NOTE:

 

Using spacers 

are optional but 

recommended.

NOTE:

 Firmly place 

RJ45 connector in the 

port. Your should feel 

a ‘click’ indicating a 

secure connection

Summary of Contents for Fiber Optic Star

Page 1: ...so used as booster wires to power over 19 panels see diagrams on page 3 and 4 For a smooth installation we highly recommend the following Painters tape or a light adhesive masking tape to organize cab...

Page 2: ...K V ADJ 100 240VAC 0 55A 50 60Hz N L DC OK Leave the lead wire from the POWER SUPPLY and EPIC LINK RJ45 cable hanging off the side of the first panel so you can connect the next panel Power supply and...

Page 3: ...CONTENTS ACOUSTICAL FIBER OPTIC STAR PANELS EPIC LINK HIGH POWER MAGNETS READ SAFETY WARNING ON PG 8 RJ45 QUICK CONNECT CABLES 12V POWER SUPPLY SPACERS MOUNTING SCREWS AND 50LB DRYWALL ANCHORS LEAD BO...

Page 4: ...V ADJ 100 240VAC 0 55A 50 60Hz N L DC OK 1 2 3 4 MODE 1 GND 2 IN RS 232 OUT LED 1 LED 2 LED 3 LED 4 LED 5 Epic Stars LED 6 LED 7 LED 8 1 2 3 4 MODE 1 GND 2 IN RS 232 OUT LED 1 LED 2 LED 3 LED 4 LED 5...

Page 5: ...THE CENTER OF YOUR ROOM AND WORKING OUT BE VERY CAREFUL WITH MAGNETS There is a very strong bond with the provided magnets Separate them ONE AT A TIME by sliding them apart NOTE Not every room is squ...

Page 6: ...e to avoid screws slipping sideways 3 4 Place each assembled magnet and screw in the center of each metal plate on the star panel Hold panel up horizontally to ceiling until all screws lightly touch W...

Page 7: ...nel by SLIDING off the metal plate If your installation surface is different than drywall then you must supply and use your own appropriate anchor mounts and or screws to suit Failure to do this will...

Page 8: ...nect your RJ45 Quick connect cable from the ceiling to the IN port of your first first star panel Take your next RJ45 cable and connect to the OUT port and hang off to the side for your next panel NOT...

Page 9: ...a closed fist EZ MOUNT MAGNETS ARE VERY STRONG AND BRITTLE DO NOT OVER TIGHTEN SCREW AS MAGNET WILL SHATTER MAGNETS CAN LEAP TOGETHER UNEXPECTEDLY WITH EXTREME SPEED AND FORCE CAUSING POTENTIAL INJUR...

Page 10: ...e from the panel Carefully cut a clean X into the center of the fabric Fold flaps back through the opening Spray back of loose flaps with a 3M super 77 spray and press flat to surface If a fiber or 2...

Page 11: ...p Scintillation Down Up Down Up Tropical Winds Up Down Down Up Constellation Mode Down Down Down Up Shooting Star 10 Sec Up Up Up Down Shooting Star 1 Min Down Up Up Down Shooting Star 2 Min Up Down U...

Page 12: ...10 Minutes Shooting Star every 10 minutes sso Shooting Star Off Boards in shooting star mode will turn off ssg Shooting Star On Shooting star on mso Meteor Shower On Meteor Shower mode DIP switches mu...

Reviews: