Page 5 of 22
Receiving, Handling & Storage
Receiving, Handling & Storage
Unpacking
Unpack the equipment and check for damages or material shortages immediately. The bill-of-material
from the Unit Assembly (switch) and Operating Mechanism drawings should be used for this purpose. If
damage or a shortage is noted, file a claim immediately with the carrier and contact the factory.
Storage
All components of the EC-1 aluminum center side break disconnect switch are suitable for outdoor use
and do not have any special storage requirements. Keep bearings out of standing water. Keep upright
and support live parts with base. If a motor operator is furnished, be sure to connect the heater circuit
using the provided external wiring, while the unit is in storage. Discard the wiring upon installation.
Typical crating is intended for storage less than 1 year
. If long term storage is required please notify
factory at time of order placement so that special crating can be used.
These switches are top-heavy and unstable unless bolted down. To prevent
personnel injury or equipment damage, use extreme care when uncrating.
Summary of Contents for EC-2V
Page 2: ...Page I The Quality Name in High Voltage Switching THIS PAGE LEFT INTENTIONALLY BLANK...
Page 6: ...Page V The Quality Name in High Voltage Switching THIS PAGE LEFT INTENTIONALLY BLANK...
Page 7: ...Page VI The Quality Name in High Voltage Switching Type EC 2V...
Page 31: ...Page 22 of 22 Recommended Inspection Maintenance Comments...