I
NSTALLATION
M
ODEL
EZ-3 & EZ-5 C
OUNTERTOP
S
TEAMERS
Step 2: Install the Legs
1. Uncrate carefully. Report any hidden damage to the freight carrier IMMEDIATELY.
2. Do not remove any tags or labels until unit is installed and working properly.
3. Remove placeholder bolts holding bottom cover onto unit and discard.
4. Screw legs into the bottom of the unit until approximately 1/4" of thread is showing. The legs with rubber
suction cups go on the back of unit.
INSTALLATION
5. Slip drain pan guides into place between legs and bottom of steamer, as shown in Figure 1, making sure
that pan stops are toward the rear of the unit.
6. Tighten legs, making sure that the pan guides stay seated against the leg threads.
7. To level the unit, adjust the base of unit’s legs.
8. Place custom drain pan under unit.
Figure 1
NOTICE
Unit must be level to assure maximum performance. Improper leveling may void warranty.
CAUTION
WATER FROM A FULL CAVITY CANNOT BE HELD IN A 12" x 20" X 2½" PAN..
P
AGE
6 O
PERATOR
’
S
M
ANUAL
1178387
REV
5