
Page 14 / 22
Assembly instructions
Compact-Line kit
www.sorotec.de
V 2.1.0
Before aligning the X-axis, check that the following
screw connections are not yet tight, but only slightly
counter-tightened:
E1
Connections portal beam / portal cheeks
D1
Connections angles / portal cheeks
C5
Connections angles / portal beam
C2
Connections angles / profile
• If necessary, loosen screw connections and
tighten slightly.
• Move the portal several times from one end of
the base frame to the other end while gradually
tightening the screws. The order is the same as
for the loose check:
E1
Connections portal beam / portal cheeks
D1
Connections angles / portal cheeks
C5
Connections angles / portal beam
C2
Connections angles / profile
• Check whether the portal can be moved easily
over the entire travel path after tightening all
screws.
• Press the cover caps onto the angles.
Fig. 12: Tighten the portal screw connection
E1
C5
D1
C2
D1
D1
C2
E1
22
•
Tighten the X-axis ball nut grease fitting so
that it faces the opening in the gantry beam (red
arrows in Figure 13).
• Screw the recirculating ball nut
4k
to the
flange block X
8
using cylinder screws M5x20
C4
; Slightly counter-tighten the screws.
•
Move the portal until the flange block X is
located above the lower portal beam
22
.
•
Screw the flange bracket X to the portal beam
using cheese head screws M5x18
C3
; Slightly
counter-tighten the screws.
Fig. 13: Screw connection of X-spindle nut and beam
C4
4k
22
C3