Verification and Calibration
Sorensen SFA Series
SHUNT
Figure 4–1. Precision Current Shunt
4.2
STANDARD VERIFICATION AND CALIBRATION
PROCEDURE
All calibration potentiometers can be adjusted through access holes in the top
cover of the SFA Series unit. It is
not
necessary to remove the top cover to
perform the calibration procedures.
4.2.1
C
URRENT
M
ODE
1. Set the SFA Series unit to operate in remote current programming
mode using an external 0-5 Vdc voltage source as shown in Figure 3–6
in Section 3.3 Remote Current Programming.
2. Attach a precision meter across the shunt Kelvin terminals.
3. Attach a precision meter in parallel with the voltage programming
source.
4. Set the voltage source to 0.0V ± 1mV.
5. Apply AC power and verify the current mode indicator is illuminated.
6. Verify the unit is set to 0A ± 0.8% of full-scale output. If necessary,
adjust R55 for zero current through the shunt. (See Figure 4–2.)
7. Set the programming voltage to 5.0V ± 1mV.
8. Verify the unit is set to 100% ± 0.8% of full-scale output current. If
necessary, adjust R69 for 100% of full-scale current on the shunt.
4-2
M550292-01 Rev C
Summary of Contents for SFA Series
Page 2: ......
Page 4: ...This page intentionally left blank M550292 01 Rev C ii...
Page 6: ...This page intentionally left blank M550292 01 Rev C iv...
Page 8: ...This page intentionally left blank M550292 01 Rev C vi...
Page 10: ...This page intentionally left blank M550292 01 Rev C viii...
Page 14: ...This page intentionally left blank iv M550292 01 Rev C...
Page 46: ...Operation Sorensen SFA Series This page intentionally left blank 3 18 M550292 01 Rev C...
Page 56: ...Maintenance Sorensen SFA Series This page intentionally left blank 5 4 M550292 01 Rev C...