All Projector Models
HDD condition
• Confirm that there is no error on the Status screen
UPS
• Check for errors
• When UPS power supply has been stopped for a long time, two days before
the server
system is up and running, start the UPS and complete the charging
Confirm Operation Including Audio and Theater Automation
• Check the interlocking operation with SPL
LMT-200/300, XCT-S10, XCT-M10
• Lithium Battery
• Confirm absence of battery alarm, replace as necessary
Screening with DCP
• Final test