3-2E
3-3.
CD-169 AND BD-21 BOARDS
*
When measuring the B side of CD-169 board
(When the Video-CD mechanism board is normal and the CD-169 board is measured singly.)
3-4.
MB-77 BOARD
1
Replace the flat cable between CD-169 board CN304
and MB-77 board CN605 with the flat cable between
CD-169 board CN303 and BD-21 board CN101.
(CD-169 board CN303 and BD-21 board CN101
are left open.)
BD-21 board
CD-169 board
Stand the Video-CD mechanism deck in a vertical
position on the VHS mechanism deck.
insulator
CN304
CN303
CN605
CD-169 board
CD-169 board
MB-77 board
insulator
Stand the Video-CD mechanism
deck in a vertical position on the
VHS mechanism deck.
Summary of Contents for SLV-7700KME
Page 8: ...1 1 SLV 7700KME 7700KML SECTION 1 GENERAL This section is extracted from instruction manual ...
Page 9: ...1 2 ...
Page 10: ...1 3 ...
Page 11: ...1 4 ...
Page 12: ...1 5 ...
Page 13: ...1 6 ...
Page 14: ...1 7 ...
Page 15: ...1 8 ...
Page 16: ...1 9 ...
Page 17: ...1 10 ...
Page 18: ...1 11 ...
Page 19: ...1 12 ...
Page 20: ...1 13 ...
Page 21: ...1 14 ...
Page 22: ...1 15 ...
Page 23: ...1 16 ...
Page 24: ...1 17 ...
Page 25: ...1 18 ...
Page 26: ...1 19 ...
Page 27: ...1 20 ...
Page 28: ...1 21 ...
Page 29: ...1 22E ...