4-10
SAL135F28 (STF 2.8(T4.5)/135) (135mm F2.8 [T4.5] STF)
Finished Inspection JIG
Lens
4-1-3. Connection of Finished Inspection JIG and Lens Adjustment Program
(ActuatorChecker.exe)
Note:
Confirm “4-1-2. Lens Adjustment Program (ActuatorChecker)” has been completed before this procedure is executed.
Equipment
• Personal Computer
• USB cord with connector
• Finished Inspection JIG (AC 100 V only)
• Lens Adjustment Program (ActuatorChecker)
1.
Connect equipment and checking lens as shown Fig.4-1-20.
Fig.4-1-20
2.
Turn on the finished inspection JIG.
3.
Turn on the personal computer.
4.
Start up “ActuatorChecker.exe” from an arbitrary folder, conform that start up program normally.
Note:
Turn off the finished inspection jig after use.