42
HCD-HPZ7/HPZ9
2-9. ASSEMBLING OF THE GEAR (SUB GEAR PIN RIGHT)
1
Turn over the stocker assy
in the direction of the arrow.
2
Remove the arm (R)
in the direction of the arrow.
4
two screws
(2
×
5)
3
two dowels
6
Adjust phases.
gear (sub gear pin right)
gear (stock rotary right)
gear (stock joint)
7
washer (5.5)
5
gear (sub gear pin right)
PRECAUTION DURING GEAR
(SUB GEAR PIN RIGHT) INSTALLATION
UPPER
SIDE