3. Installation
SONY AIT-2 Turbo drive SDX-560V series Ver.1.0
3-2
Table 3-2: Periodic Cleaning Request (Refer to 4.5.1.2)
DIP SW 6
Definition
OFF
Disable Periodic Cleaning Request
ON
Enable Periodic Cleaning Request
3.1.1.
Data Compression ON Switch
Data compression can be selected by DIP switch.
DC Control-1
DC Control-2
Definition
OFF
OFF
Compression disabled at power-on. The host is allowed to control
compression.
OFF
ON
Compression disabled at power-on. The host is not allowed to control
compression.
ON
OFF
Compression enabled at power-on. The host is allowed to control
compression.
ON
ON
Compression enabled at power-on. The host is not allowed to control
compression.
Figure 3-3: Data Compression Switches
3.1.2.
Power Connector
The power connector is illustrated as Figure 3-4.
5V GND GND 12V
4 3 2 1
Figure 3-4: Power Connector
3.1.3.
IDE Interface Connector
Figure 3-5 illustrates IDE 40 pin connector and table 3-3 shows the assignments for the pins of the connector.
Figure 3-5: IDE Device Connector
Pos 39
Pos 1
Pos 40
Pos 20 (Pin removed)
Pos 2