GR47/48 Design Guidelines
BA/SEM/MS 03:0015 Rev A
LZT 123 7596
27
6.3 SIM Testing
SIM electrical testing does need to be carried out since the electrical
paths from which it was originally approved against (developers kit
board) have changed. This will typically take around 3 hours in a test
house.
Other points to note regarding the implementation of the SIM card
holder are as follows.
•
SIM presence must be implemented to comply with the module
approval conditions.
•
Any manufacturers SIM card holder can be used and this can also
be either 6 or 8 pins.
6.4 EMC/ESD & Safety
EMC and safety tests according to the ITU/GSM and FCC standards
will have to be completed as part of the mandatory testing. The GR
47/GR48 were originally type approved without additional shielding
around the application. This is the responsibility of the system
integrator. Overall ESD protection should be guaranteed by the system
integrator.
The EMC standard which the application must be tested to is EN 301
489-7, this can be found at the following web site.
http://www.etsi.org/getastandard/home.htm
The safety standard which the application must be tested to is EN
60950, the can be found at the following web site
http://www.iec.ch/
For the GR48 FCC part 15 regulations, these can be found at
http://www.fcc.gov/
6.5 RF Testing
6.5.1 GR47
As long as the antenna connected to the module is of the correct
impedance as specified in section 3.7 and is passive further RF testing
for TA is not required. Although it should be noted that radiation
performance is the responsibility of the system integrator.