background image

10

•  Take the supplied cable and attached it to the input of the device. Secure the safety screw  

(Picture 6 and 7) to prevent cable disconnection and insure the IP rating of connector.

WARNING

•  Interference with the device interior is permitted only when replacing batteries. Any other 

interference with the device is strictly prohibited.  

•  Batteries are standard AA size batteries, but if you insert 1.5 V alkaline batteries, the device 

will not work. Use ONLY SAFT LS14500 batteries.

Pictures 3, 4 and 5. Holders for two AA size batteries

Pictures 6 and 7: Cable Connection

+

-

+

-

Summary of Contents for COMBOX.L

Page 1: ...1 USER MANUAL COMBOX L Long Range Low Power Wireless Logger...

Page 2: ...ynx com Solvera Lynx d d is entered in the Court at Ljubljana District Share capital 53 434 75 EUR ID number 1716808000 VAT ID SI98578537 Board Chairman dr Otmar Zorn Bank account SI56 0203 6009 1956...

Page 3: ...LTypes 5 3 Tehnical data 6 3 1 Dimensions 6 4 Technical data according to type 7 4 1 ComBox L CI B type 7 4 2 ComBox L DI B 8 4 3 ComBox L 2T B 8 5 Installation 9 5 1 Notification for installation 9...

Page 4: ...is prohibited Solvera Lynx reserves the right to change the technical specifications of its products without notice in writing and urges its customers to make sure that the information they have is va...

Page 5: ...r unconfirmed data type counter logger confirmed data type OTA C specification will be sent on request 100 most recent measurments are saved localy in case of network failure 2 5 COMBOX L TYPES 1 PULS...

Page 6: ...acitance 110 pF Voltage 3 6V 3 INPUT 2T B Impedance 4 k Capacitance 325 pF Voltage 3 6V 4 POWER Battery 2x AA LI SOCI2 LS145000 3 6V Battery Capacity 2 x 2600 mAh 5 TEMPERATURE Operation 20 C to 60 C...

Page 7: ...3 1 packet day 7 5 6 9 CI B CNT1 10Hz CNT2 1Hz Period Autonomy SF7 Autonomy SF12 4 packets hour 1 5 0 5 1 packet hour 1 7 1 1 1 packet day 1 7 1 7 CI B CNT1 70Hz CNT2 0Hz Period Autonomy SF7 Autonomy...

Page 8: ...ket day 9 7 8 7 Autonomy 4 2 COMBOX L DI B Left connector Right connector DI B Period Autonomy SF7 Autonomy SF12 4 packets hour 6 1 0 9 1 packet hour 8 5 2 7 1 packet day 9 7 8 8 All values in years M...

Page 9: ...or rebooting the device and resetting the counters After the reset is asserted the device starts registration to the network 5 INSTALLATION 5 1 NOTIFICATION FOR INSTALLATION 5 2 HARDWARE INSTALLATION...

Page 10: ...WARNING Interference with the device interior is permitted only when replacing batteries Any other interference with the device is strictly prohibited Batteries are standard AA size batteries but if...

Page 11: ...the batteries the device automatically begins with the activation process to connect to the NMS Network Management Server and AMS Application Management Server Connection registration and communicatio...

Page 12: ...12 6 RECOMMENDED FIELDS OF USE Smart Buildings Smart Industries Smart Grids Smart Energy Picture 13 LoRaWAN Network Structure Picture 14 Energy Management System...

Page 13: ...13 7 CERTIFICATION 7 1 LORA CERTIFICATE OF COMPLIANCE...

Page 14: ...14 7 2 SIQ CERTIFICATE...

Page 15: ...he relevant harmonised standards used or references to the other technical specifications in relation to which conformity is declared EN 60950 1 2006 A 1 201 0 A2 2013 A 11 2009 A 12 2011 EN 301 489 1...

Page 16: ...16...

Page 17: ...e relevant harmonised standards used or references to the other technical specifications in relation to which conformity is declared EN 60950 1 2006 A 1 201 0 A2 2013 A 11 2009 A 12 2011 EN 301 489 1V...

Reviews: