Manual FRAME-EVO-P20 / P20-US
Version 1.6
10.01.2019
Page
16
of
39
Step 3:
Place the
6 x Ø6 Schnorr Washers (2)
over each corresponding hole. Secure the
6 x M6x30 ISO 7380 screws (1)
into each hole with 4 Nm torque. Ensure each screw runs
through the plate and catches into the corresponding M6 hole in the projector surface.
Please make sure to use only the correspondent screw holes when installing a projector!
Do not forget to use the 6 x Ø6 Schnorr Washers (2) as they are preventing the screws to
loose themselves!
In case you removed the upper ring during Step 1 please now refer to chapter
7. Reinstalling the Upper Ring
and attach the upper ring back to the base.
Step 4
: The lens can be attached back to the projector.
Torque: 4±0.5 Nm
1
2