Manual FRAME-EVO-P20 / P20-US
Version 1.6
10.01.2019
Page
8
of
39
For stacking, make sure that all four locking pins pass completely through the female
stacking bolt.
•
Make sure the four male bolts enter into the correspondent female bolts and are
locked.
Do not install the FRAME-EVO-P20 / P20-US or the projector while people are present
under the mounting zone during the installation process.
•
When installing the projector, make sure no one is in the area underneath the
installation zone.
Always secure the frame to the rigging truss with a safety steel cable.
•
The frame should always be secured with an appropriate safety steel cable so that in
case of a malfunction it doesn’t fall more than 5 cm. Please consult the local laws or
regulations regarding the additional safety of hanging equipment.
CAUTION
Before installing the projector in the FRAME-EVO-P20 / P20-US frame, please read the
projector’s user manual. When the projector has a lens attached, please remove it.
•
The FRAME-EVO-P20 / P20-US frame with the projector inside must be installed only
in an environment that is recommended by the projector manufacturer.
Minimum two persons are required to install the FRAME-EVO-P20 / P20-US frame.
•
With regard to the overall weight of all necessary installation devices, make sure to
handle those with at least two people.
Make sure that the structure from which you hang up to 3 FRAME-EVO-P20 / P20-US
frames including projectors is capable of carrying the overall weight of approx. 290 kg
(639.34 lbs) plus the weight of all additional equipment as well as other potential systems.
•
Prior to any installation, you must do a visual inspection to make sure that the
system is in a good condition. For more information please refer to chapter “
System maintenance and inspection (Re-examination)