21
/
46
home environment. Select the installation site according to the following
requirements:
●The installation site should be well ventilated, free from rain and direct sunlight;
●The installation floor should be dry and flat. It is strictly forbidden to have water
on the ground; ensure that the ground level is not shaken and can fully carry the
weight of the energy storage integrated machine cabinet.
●The temperature in the installation environment should range from -10 °C to
40 °C; the relative temperature should range from 4 to 100 %.
●Reserve enough installation spacing between the front, rear, left and right, top
and wall of the energy storage integrated machine cabinet to ensure good
ventilation, heat dissipation, installation and maintenance, and safe escape.
●There are no combustible gas and flammable materials nearby.
●The installation environment should be clean.
3.4.3 Installation procedures
The mechanical installation steps are as follows:
Step1
user can find 3 units of battery module and 1unit of the case of Soluna after
opening the packing box
.
Figure 3.1 Soluna system case & Battery units
Number
Name
Remark
①
System case
②
Battery module
①
②
Summary of Contents for S12 NA Series
Page 1: ...1 46 User Manual Home Energy Storage System Soluna S12 NA Mar 2020 Revision A 0...
Page 15: ...15 46 2 6 Appearance Figure 2 3 Appearance Number Name Remark Soluna brand LCD panel...
Page 17: ...17 46 Figure2 5 Appearance Number Name Remark Door lock of system Door Key...
Page 18: ...18 46 3 Installation 3 1 Installation tools...
Page 35: ...35 46 Figure 4 5 PV information Figure 4 6 Load information...
Page 36: ...36 46 Figure 4 7 Grid information Figure 4 8 Battery information...