7
1. Position of the long anchor
points
The lateral (long) anchor points are normally placed
centrally between the modules.
2. Drilling
Drill the 4 holes for mounting the single point stop
with 11.5 mm drill bit. Please use the original HSS
drilling template to drill the holes exactly.
3. Grease the components
The threads of the stainless steel nuts in the anchor
points must be completely greased with anti-seize
assembly Paste
4. Assembly of the lateral anchor
points
Insert the two halves of the anchor point into the bot-
tom rail and fix them with the supplied stainless steel
screws - but do not tighten them!
The two screws (M10) must be greased before
insertion, otherwise the stainless steel nuts may seize
when tightened.
5. Tightening
Stainless steel screws (M10 x 25) are screwed to the
base plate from the outside through the floor rails with
the anchor point. (Tightening torque = 25 Nm)
6. Cantilever mounting
Place the cantilever and fix it with the supplied stainless
steel screws - but do not tighten!
Option: Lifting with spacer
In the case of green roofs or elevated gravel, the
spacers can be used. They raise the guide rails.
4. Installation of the lateral anchor points (long)
Put the second anchor point into the foor rail...
Place the cantilever
…and tighten!
Position of the long anchor points
Drill holes in floor rails with drilling template