Page 2: ...Overview The Duraklick height safety system consists of the following components Fitting pieces are made during assembly step in out HSS rail in different lengths 1m 3m und 6m rail curve e g 90 also available in other angles rail connector rail switch single fixing point Spacer optional to raise the system Each HSS comes with two equipment sets These bags contain the equipment necessary for securi...
Page 3: ...nt sets safety harness fall protection runner fall arrester AM4 fall arrester should be stored near the entrance or roof access 3 Protection during assembly Please ensure that you are properly secured against falling during installation For safety reasons work in the fall area must not be carried out alone Photograph roof damages Before installation it should be checked whether there is any damage...
Page 4: ...te 22 66 m Länge 24 96 m Leistung 39 62 kWp Modulanzahl 139 Sprungmaß 2 00 m Modullänge 1 690 m Module pro Reihe 13 Anzahl Reihen 13 30 wegfallende Module Objektname DE_München_Emmy Noether Straße_200099 Kommission Grundschule Leopoldsed Feld 1 von 1 Lageplan x x x x x x x x x x x x x x x x x x x x x x x 4x6m 4x6m 4x6m 1x3m 1x3m 12x6m 4x Kur 2x ein 12x La 11x ku 108m S 100 Kle 3x Mot 1x Spe 25 Ver...
Page 5: ...ances and the folding fall protection runners are used Placement of the anchor points The anchor points are mounted on the floor rails The standard distance is 3 m to 4 5 m only in special cases a distance of up to 6 m is permitted Requirements for the floor rails Don t install short rails 0 70 m and 1 40 m at the be ginning and end of a composite where anchor points are to be installed The profil...
Page 6: ...ith anti seize assembly Paste 4 Assembly of the front anchor points short Insert the two halves of the anchor point into the bot tom rail and fix them with the supplied stainless steel screws but do not tighten them The two screws M10 must be greased before insertion otherwise the stainless steel nuts may seize when tightened 5 Tightening Stainless steel screws M10 x 25 are screwed to the base pla...
Page 7: ...ess steel screws but do not tighten them The two screws M10 must be greased before insertion otherwise the stainless steel nuts may seize when tightened 5 Tightening Stainless steel screws M10 x 25 are screwed to the base plate from the outside through the floor rails with the anchor point Tightening torque 25 Nm 6 Cantilever mounting Place the cantilever and fix it with the supplied stainless ste...
Page 8: ...ope clamps Thread 2 rope clamps between each rail and guide the rope through the holes in the rails If an anchor point is only mounted on one side one rope clamp is enough This must then be mounted on the opposite side to the anchor point Tension the steel rope and fasten it to the opposite an chor point with 2 rope clamps If the anchor point is on one side pass it through the last drilled rail an...
Page 9: ...but do not tighten yet 5 Connecting the guide rails Insert the corresponding number of M10 x 20 stain less steel screws into the next rail Join the rails using the connectors and screw them together 6 Finnishing Fasten the rail as described under point 1 but do not tighten it Repeat this procedure until the next bend or entry point 6 Installation of the guide rails Fixieren of the guide rail Conne...
Page 10: ...nectors using the drilling template Drill Ø 10 5mm 1 Countersinking holes outside With sinker 20 5mm 90 3 Countersinking holes inside With sinker 12 4 mm 90 with cut tip 7 Assembling the fitting pieces Measure the distance between the rails drilling with the template sink the holes outside sink the holes inside Drilling and metal chips must be removed from the roof ATTENTION ...
Page 11: ...point The torque for stainless steel screws M10 strength class 70 is 25 Nm Finally check all screw connections for tightness 3 Assembly of the entrys and end stops Please check the position of the entrys before mounting them The entry should be at least 2 5 m away from the nearest fall edge to allow safe use of the HSS System Every entry or end stop must be fixed on an anchor point and not protrud...
Page 12: ...ndicates whether the system is ready for operation and use or not e g due to maintenance or conversion work Attach the holder in a clearly visible position either to the roof ladder or to the nearest HSS entrance and insert the card with the corresponding side 6 Providing the equipment sets The equipment sets red bag case should be stored in such a way that they are quickly available to any roof c...
Page 13: ...auptsitz Schweiz SOLTOP Schuppisser AG St Gallerstrasse 3 5a CH 8353 Elgg www soltop ch Sitz der Gesellschaft Lindenberg Registergericht Kempten Allgäu Geschäftsführer Andreas Zimmerer Handelsregister HRB 14331 MwSt 127 137 60143 UID DE300491338 EORI DE314291943832627 ...
Page 14: ...mbH Sonnenhalde 5 D 88161 Lindenberg www soltop eu Hauptsitz Schweiz SOLTOP Schuppisser AG St Gallerstrasse 3 5a CH 8353 Elgg www soltop ch Sitz der Gesellschaft Lindenberg Registergericht Kempten Allgäu Geschäftsführer Andreas Zimmerer Handelsregister HRB 14331 MwSt 127 137 60143 UID DE300491338 EORI DE314291943832627 ...