70
Fig. 36.8
2627
E:
On the Back of the fort measure 21-5/8” from (2646) Roof End and 1-1/4” down from the top of the panel, pre-
drill with a 3/16” drill bit then place 1 (2684) Mid Roof End centred over the pilot hole and flush to the top of the
panel attach from the inside with 1 (S4) #8 x 3” Wood Screw and from the outside with 1 (S3) #8 x 2-1/2” Wood
Screws. (fig. 36.7 and 36.8)
F:
On the Front of the fort measure 21-5/8” from (2647) Roof End Left and 1-1/4” down from the top of the panel,
pre-drill with a 3/16” drill bit then place 1 (2684) Mid Roof End centred over the pilot hole and flush to the top of the
panel and attach from the inside with 1 (S4) #8 x 3” Wood Screw and from the outside with 1 (S3) #8 x 2-1/2” Wood
Screws. (fig. 36.7 and 36.9)
Step 36: Attach Roof Ends
Part 3
Flush
Flush
2622
2618
Front
Back
Fig. 36.9
2677
2618
2647
2646
2647
Swing Wall
Fig. 36.7
Left Side
2684
2684
2677
2677
2684
2646
Flush
Flush
Front
Back
Hardware
2 x
Mid Roof End 1-1/4 x 4-7/8 x 7”
Wood Parts
2684
2 x
#8 x 2-1/2” Wood Screw
2 x
#8 x 3” Wood Screw
S3
S4
S3
S3
S4
S4
2677
2618
2618
2684
21-5/8”
21-5/8”