17
SOLID AIR ® INTERNATIONAL
•
T +31 598 36 12 21
•
www.solid-air.com
•
Image: CPL-C 10/15/22
Image: CPL-C 32
Entry for on-site cables
Entry for on-site cables
Open bypass
inspection door
Remove cover plate from
control unit and connect cables
according to wiring diagrams.
Check cover plate for leak
tightness when installing.