12
SOLID AIR ® INTERNATIONAL
•
T +31 598 36 12 21
•
www.solid-air.com
•
5.1 CPL-C installation location
>>
The CPL-C is designed as an indoor unit and intended solely for ceiling installation.
>>
The ceiling where the unit will be mounted must be level and sufficiently load bearing (min. 500 kg/m²).
>>
Only install the unit with the standard suspension brackets supplied, as shown in the illustration.
>>
For the CPL-C-32, we recommend using the drilled hole in the middle of the suspension bracket.
>>
The lifting lugs fitted to the CPL-C-32 as standard are intended for lifting and turning the unit. Never use
them for mounting the unit on the ceiling. After use, the lifting lugs can be removed and the drilled holes
sealed with the supplied blanking plugs.
>>
Never drill holes or insert screws in the ceiling panels, as this may damage the electric cables under
the panels.
>>
The installation location must meet the requirements of VDI 2050.
>>
Provide sufficient space below the unit for maintenance work.
>>
Site the unit in a room that is free from the risk of frost.
>>
Provide a drain connection for discharging any condensate that may be generated.
Suspension bracket for CPL-C 10/15/22/32
Dimensioning for CPL-C 10/15/22/32
5. PLANNING
70
-1
50
70
-1
50
70
-1
50
70
-1
50
Minimum clearance between
outdoor air intake and exhaust
air outlet to prevent an
"air short circuit" (DIN 13779).
>
3
m
>
2
m
Supply air
Outdoor air
Extract air
Exhaust air
Please
note