![Solfex IRC 2.1 System Installation, Commissioning And Maintenance Manual Download Page 15](http://html.mh-extra.com/html/solfex/irc-2-1/irc-2-1_system-installation-commissioning-and-maintenance-manual_1315239015.webp)
Page 14 of 24
Installation instructions – Wooden frame collectors
In-roof installation
(33)
As in stage (32), nail the covers to the wooden frame
using sealed plumbing nails.
(34)
Mounting of the cover’s superior left corner:
The sheet must be meticulously inserted into the
collector’s upper profile.
(35)
Fasten this piece of cover to the wooden wedge using
sealed plumbing nails.
(36)
As for the bottom elements, the straight upper pieces
must be first sideways inserted one into another. The
fitting into the collector’s profile must be meticulous.
Installing the collectors - page 15
Technical changes may be made without notice