13 • Installation
________________________________________________________________________________________________
6.
INSTALLATION
WARNING!
Do not interchange line and load connections
Do not connect the RVS-AX “Inside Delta” (consult factory)
6.1
Prior to Installation
Check that Motor’s Full Load Ampere (FLA) is lower than, or equal, to the starter’s Full Load Current (FLC)
and that Mains and Control voltages are as indicated on the starter’s side label.
Make sure Starter’s FLC
≥ Motor FLA!
Make sure Mains voltage is right!
Make sure control is by voltage free contact!
RVS-AX label - example
6.2
Mounting
The starter must be mounted vertically. Allow sufficient space (at least 100mm) above and below the starter
for suitable airflow.
It is recommended to mount the starter directly on the rear metal plate for better heat dissipation.
Do not mount the starter near heat sources.
Surrounding air temperature in the cabinet should not exceed 40ºC
Protect the starter from dust and corrosive atmospheres.
Note
: For harsh environments (sewage treatment plants, etc.), it is recommended to order the starter with
printed circuit board coating. Refer to section
3.7.1 on page 8 for ordering information.
6.3
Tightening Torques
All control terminals 1-8 should be tighten at 0.5Nm (4.42lbfin).
RVS-AX
model
L1, L2, L3
U, V, W
Gnd
RVS-AX 8
16mm
2
terminal
2.5Nm
(22.13lbfin)
M4
2Nm
(17.7lbfin)
RVS-AX 17
RVS-AX 31
RVS-AX 44
RVS-AX 58
M6
5.5Nm
(48.68lbfin)
M6
5.5Nm
(48.68lbfin)
RVS-AX 72
RVS-AX 85
M8
15Nm
(132.76lbfin)
M8
15Nm
(132.76lbfin)
RVS-AX 105
RVS-AX 145
M8
15Nm
(132.76lbfin)
M8
15Nm
(132.76lbfin)
RVS-AX 170