Quick Installation Guide
——
Triple Power Lithium-ion Battery
Packing List (T-BAT H 5.8)
I
III
Note: The quick installation guide describes installation steps briefly. If you have any questions during
the installation, please refer to the USER MANUAL which is enclosed to T-BAT H 5.8 for more information.
II
Battery Installation
IV
Overview of Installation
V
Quick installation guide
*
1
Quick Installation Guide
——
Triple Power Lithum-ion Battery
Make sure that the installation location meets the following conditions:
Ÿ
The building is designed to withstand earthquakes
Ÿ
The location is far away from the sea, to avoid salt water and humidity
Ÿ
The floor is flat and level
Ÿ
There are no flammable or explosive materials nearby
Ÿ
THE AMBIENCE IS SHADY AND COOL, KEEP AWAY FROM HEAT AND AVOID DIRECT SUNLIGHT.
Ÿ
The temperature and humidity stays at a constant level.
Ÿ
There is minimal dust and dirt in the area.
Ÿ
There is no corrosive gases present, including ammonia and acid vapor.
Ÿ
The ambient temperature is within the range from 0°C to 55°C, and the optimal ambient temperature is between
15℃ and 35°C.
NOTE: 1. The distance between the bottom of battery pack and floor shall not exceed 300mm.
2. It is recommended that the space between battery packs is more than 300mm.
- Mark the position of the holes.
- Screw the expansion bolts.
- Match the battery with the bracket.
- Drill holes with driller.
- Depth: at least 50mm.
- Install the expansion bolts.
Bracket(377*140*69mm)
(for wall mounting)
Note: 1. For T-BAT H 5.8 + 1~3 battery packs, please finish the battery installation before connecting cables!
2. Please make sure that the Inverter is off when connecting cables!
NOTE!
The Triple Power battery module is rated at IP55 and thus can be installed outdoors as well as indoors.
However, if installed outdoors, do not allow the battery pack to be exposed to direct sunlight and moisture.
NOTE!
If the ambient temperature is outside the operating range, the battery pack stops operating to protect itself.
The optimal temperature range for the battery pack to operate is 15°C to 35°C. Frequent exposure to harsh
temperatures may deteriorate the performance and lifetime of the battery module.
380<height<650mm
30<height<300 mm
Installation Prerequisites
Packing List (HV11550)
Power line (+)*1
Quick installation guide
*
1
Quick Installation Guide
——
Triple Power Lithum-ion Battery
T-BAT H 5.8*1
Power line (-)*1
CAN cable (+)*1
Series-connected plug*1
Cover plate1*2 M4 screw*8
Wall bracket*1 M5 screw*1
Expansion bolt*5
Ring terminal*2
Power cable disassembleing tool*1
User Manual*1
HV11550*1
Power cable*1
Power cable’*1
RS485 cable*1
Cover plate1*2 M4 screw*8
Wall bracket*1 M5 screw*1
Expansion bolt*5
Ring terminal*2
DANGER!
One T-BAT system is allowed to install at most four battery packs.
Connecting more than four battery packs will blow the fuse, and the
battery pack will be damaged. Please make sure the number of battery
packs meets the requirement.
- Lock the joint between hanging
board and wall bracket with M5
screw.
Cover plate2*2
Cover plate2*2